PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 NOVEMBER 2020
12.3.2 Methods of transfer including, inter alia, mastication of native vegetative
matter, tile transfer of live soil/plant matrix, peat locations and extents,
sexual and vegetative methods of revegetation of offset receiving site
and other deemed pertinent matters by a person with industry
experience in the successful establishment and/or re-establishment of
heathland vegetation;
12.3.3 Transfer of rare and threatened plant species (sexual and/or
vegetative);
12.3.4 Details of pre-treatment works prior to transfer of soil/seed bank media
off the site and methods of transplanting;
12.3.5 Details of seed collections times and estimated establishment
procedures and times;
12.3.6 Details of the receiving site, including tenure, contractual details,
establishment, monitoring and maintenance details and suitability of the
site for the purpose;
12.3.7 All information must be prepared by a person with industry experience
in the successful establishment and/or re-establishment of heathland
vegetation. Industry and educational institution involvement is
recommended.
The establishment of the vegetation offsets for each stage must be completed
prior to the commencement of the use for each stage. The Vegetation Clearing
Offset program, required by these conditions, must be implemented in a staged
manner reflective of the approved staging of the development. To this end
separate Vegetation Clearing Offset programs must be developed to reflect the
staged delivery of the development, in particular the staged development of lot
6, and the subsequent development of lot 9.
12.4 No clearing is permitted unless in accordance with the approved staged
Vegetation Clearing Offset program.
14. The Vegetation Management operational works application must detail the location and
extent and staging of vegetation disturbance on Lot 9 SP252905 and Lot 6 RP901384
must be accurately marked on-site, including any setback requirements for bushfire
mitigation purposes, for Council officers to inspect prior to commencement of any
vegetation clearing.
Bushfire
23. A bushfire evacuation plan for the site must be prepared by a qualified person and
submitted to Council prior to the issue of any Development Permit for Operational
Works.
CIVIL ENGINEERING
Frontage Works
33. Pedestrian crossings shall be provided in Grasstree Court generally as shown on
‘Masterplan’ prepared by Thomson Adsett dated 15 October 2020, Plan Ref: DA_106
Rev. 3. The crossing shall include linemarking and suitable signage in accordance with
the MUTCD.
Vehicle Access
35. Vehicular access driveways to service the development shall be constructed from the
Grasstree Court frontages of the site. The driveways shall be generally in accordance
with Council’s standard drawing SEQ R-051 and Masterplan’ prepared by Thomson
Adsett dated 15 October 2020, Plan Ref: DA_106 Rev. 3.
Page 20 of 113
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.