PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 NOVEMBER 2020
ii. Where the field results and re-run MUSIC node demonstrate the required
pollution reduction efficiencies for the development are not met, the
applicant must implement additional measures to achieve the required
pollution reduction targets. The additional measures must include, in order
of priority, elevated maintenance, and then increased treatment capacity of
the stormwater quality improvement devices. Following application of
additional measures, the system must be retested in accordance with
Stormwater Australia (2018) Stormwater Quality Improvement Device
Evaluation Protocol. Version 1.2 December 2018. Where pollution
reduction targets continue to not be demonstrated the proprietary device
must be removed and replaced with a bio-retention device constructed in
accordance with an Operational Works approval or the applicant must enter
into an agreement with Council to provide improved water quality outcomes
within the catchment area.
iii. A separate water quality performance bond must be provided prior to the
issue of an Operational Works approval for Civil Infrastructure and
Stormwater for Stage 1. The water quality performance bond must be
150% of the cost of water quality monitoring required to comply with
Stormwater Australia (2018) Stormwater Quality Improvement Device
Evaluation Protocol. Version 1.2 December 2018. The performance bond
will be incrementally returned annually for the value of monitoring works
completed that year. The full value of the bond shall be returned upon
demonstration that the development delivers the required pollution
reduction targets.
C. Delete condition 21.
D. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
1. PROPOSAL
The applicant seeks approval to change to an existing development approval in the form of design
changes to the Residential Aged Care building, including the provision of 6 additional beds, and
amendment to the staging of the approval.
The applicant advises….The proposed minor change to the RAC involves amending the
configuration of the development so that beds are located around central living and service areas
for improved functionality and amenity for residents. The revised design also improves infection
control within the new facility which is particularly important in light of COVID-19.
The changes are largely kept within the approved building footprint, with only minor amendments
to building setbacks. The changes result in additional beds being able to be provided for the
community but we note, importantly that there has been no increase in Gross Floor Area (GFA)
proposed.
As a consequence of the internal layout changes, modifications to the elevations are also required.
This has presented an opportunity to improve the development’s aesthetic…….
The approved development currently comprises three stages, consisting of:
Stage 1: RAC, central facilities, ILAs above the central facilities and 50% of ILUs
Stage 2: Remaining 50% of ILUs
Stage 3: Four buildings for the ILAs.
Page 22 of 113
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.