PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             10 NOVEMBER 2020


    40.   All internal roads shall be designed and constructed in accordance with Council’s
          Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and
          Earthworks. The roads shall be:
          40.1 Generally in accordance with drawing number ‘Masterplan’ prepared by
               Thomson Adsett dated 15 October 2020, Plan Ref: DA_106 Rev. 3,
          40.2 A minimum width of 5.5 metres, and
          40.3 Suitable for Council’s refuse collection vehicle to traverse through the site
    Car Parking
    41.   Carparking shall be provided within the sites generally as shown on drawings
          numbered DA_114 “Masterplan/Carpark Layout” Rev. 3 prepared by Thomson Adsett
          Architects dated 15 October 2020 and DA_133 “Apartment Buildings – Basement”
          prepared by Smith and Tracey Architects dated November 2018 and within the
          “Independent Living Units” as shown the approved floor plans, except as modified
          herein.
    Storm Water Quality
    81.   Any proprietary stormwater quality improvement device included to achieve the
          required stormwater quality Management Objectives specified in Section 4 of the
          Girraween Stormwater Management Plan, must demonstrate only be granted an
          Operational Works Approval on the following provisions:
          a.    A suitably qualified and experienced professional must provide independent
                verification that the parameters within the node for the device in MUSIC modelling
                have been tested and verified as per Stormwater Australia (2018) Stormwater
                Quality Improvement Device Evaluation Protocol. Version 1.2 December 2018 to
                achieve the predicted outcomes in the MUSIC model for the development. For
                the purpose of this condition, the suitably qualified and experienced professional
                must be able to demonstrate a minimum 10 years urban stormwater testing and
                modelling experience and be verified in writing by Stormwater Australia as having
                an appropriate reputation and track record within the stormwater industry to
                provide such independent advice.
          b.    Where testing to achieve the certification of the proprietary stormwater quality
                improvement device is from an area with rainfall intensities and patterns that are
                statistically inconsistent with the region of the Noosa Shire that the device is to
                be installed, and / or the size of the development the device has been tested on
                is more than 2500m2 smaller than the development the device is proposed to
                service, the following additional conditions apply:
                i.    The proprietary stormwater device treatment train must be tested and re-
                      verified in accordance with the Stormwater Australia (2018) Stormwater
                      Quality Improvement Device Evaluation Protocol. Version 1.2 December
                      2018. A suitably qualified and experienced professional, as verified by
                      Stormwater Australia must use the results from the onsite testing to re-run
                      the MUSIC node for the proprietary devices and confirm whether or not the
                      required pollutant reduction efficiencies of 80% reduction in Total
                      Suspended Solids, 60% reduction in Total Phosphorous and 45%
                      reduction in Total Nitrogen for the overall development are delivered.




                                                                                  Page 21 of 113
Log in to download the original file

2020-11-10 Planning & Environment Committee Agenda(PDF, 8MB).pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.