Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPO13 AO13.1
The scenic amenity and vegetated character of the landscape Vegetation is retained:
is protected by retaining vegetation: (a) on and within 30 metres of prominent ridgelines and on
(a) along and around watercourses and drainage lines; sloping sites;
(b) on steep slopes and ridgelines; (b) in gullies;
(c) along the major road network; and (c) along watercourses and drainage lines;
(d) that forms coastal vistas to and from beaches. (d) within 10 metres of the major road network; and
(e) along the front coastal dune system.
8.2.3 Bushfire Hazard Overlay Code
8.2.3.1 Application
(1) This code applies to assessable development:
(a) subject to the Bushfire Hazard Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
(b) identified as requiring assessment against the Bushfire Hazard overlay code by the tables of assessment in Part 5 (Tables
of assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
Editor's note—Planning scheme policy 9 for assessment of natural hazards provides guidance on preparing bushfire hazard
assessments and mitigation reports.
8.2.3.2 Purpose and overall outcomes
(1) The purpose of the Bushfire Hazard overlay code is to ensure that development avoids or mitigates the potential adverse impacts
of bushfire on people, property, economic activity and the environment.
(2) The overall outcomes sought for the Bushfire Hazard overlay code are:
(a) Development in areas at risk from bushfire hazard is compatible with the nature of the hazard.
(b) The risk to people, property and the natural environment from bushfire hazard is minimised.
(c) Development does not result in a material increase in the extent and severity of bushfire hazard.
(d) Bushfire risk mitigation treatments are accommodated in a manner that avoids or minimises impacts on the natural
environment and ecological processes.
(e) Development supports and does not unduly burden disaster management response or recovery capacity and capabilities.
(f) Community infrastructure essential to the health, safety and wellbeing of the community is located and designed to function
effectively during and immediately after a bushfire event.
(g) Development avoids the release of hazardous materials as a result of a bushfire hazard event.
Table 8.2.3.3 Criteria for assessable development
Performance outcomes Acceptable outcomes
Safety of people and property
**FINAL DRAFT Post Consultation 2019**
Page 11 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.