Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                                 Acceptable outcomes
PO1                                                              AO1.1
Development maintains the safety of people and property from the Development which will materially increase the number of
adverse impacts of bushfire.                                     people living or congregating on premises, including
                                                                     reconfiguring a lot, is not located within a medium or high
                                                                     bushfire hazard area.


                                                                     AO1.2
                                                                     Development maximises setbacks from hazardous vegetation to
                                                                     achieve an acceptable risk.

                                                                     Editor’s Note — PSP8 Natural Hazards provides guidance for
                                                                     assessing bushfire hazard risk and preparing a bushfire hazard
                                                                     management plan.



Impacts on Ecologically Important Areas
PO2
Bushfire mitigation measures do not adversely impact on:             No acceptable outcome provided
(a)   biodiversity values, connectivity and ecosystem functioning;
      and
(b)   the long term physical integrity of waterways, wetland and
      areas of native vegetation.

Water Supply for Fire Fighting Purposes
PO3                                                                  AO3.1
Development provides an adequate water supply for fire fighting Premises are connected to the reticulated water supply.
purpose which is reliable, safely located and freely accessible.
                                                                 Editor's note—For reconfiguring a lot, water supply needs to
                                                                 provide for a minimum flow and pressure of 10 litres a second
                                                                 at 200kPa at all times for fire fighting purposes.

                                                                     OR

                                                                     AO3.2
                                                                     Where there is no available reticulated water supply, the premises
                                                                     has:
                                                                     (a)     an accessible dam, swimming pool or water tank available
                                                                             for fire fighting purposes with an onsite water volume of not
                                                                             less than 5,000 litres; and
                                                                     (b)     a water supply outlet pipe 50 milimetres in diameter fitted
                                                                             with a standard fire brigade fitting connected to the water
                                                                             supply (other than where the water supply is in a swimming
                                                                             pool or dam).

                                                                     Editor’s Note—Water supply capacity for fire fighting purposes is
                                                                     in addition to water supply capacity for other uses and activities on
                                                                     the premises.


Essential Community Infrastructure




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 12 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.