Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                              Acceptable outcomes
      PO7                                                               AO7
      Waste management areas are screened from the street and           Waste storage areas are visually screened by landscaping or
      adjoining properties by buildings, landscaping or fencing and     fencing.
      do not detract from the visual amenity of the streetscape or
      cause nuisance to adjoining properties.
      External storage and display of goods
      PO8                                                               AO8
      Storage areas are screened from the street and adjoining          Materials stored outside buildings do not exceed half the height
      properties by buildings, landscaping or fencing.                  of the on­site buildings or if there are no on­site buildings, the
                                                                        stored materials do not exceed 4 metres in height.
      PO9
      The storage and use of materials on site does not cause a         No acceptable outcome provided
      public health hazard or environmental nuisance.

     9.3.10.3 Criteria for assessable development assessment (part)
      Performance outcomes                                              Acceptable outcomes

      Environment
      PO10
      Industry activities are conducted in an environmentally           No acceptable outcome provided
      responsible manner, operating without deleterious impacts on
      immediate, surrounding or downstream communities,
      environments or environmental processes.

     Table 9.3.10.3 Benchmarks for assessable development assessment (part)
      Performance outcomes                                              Acceptable Outcomes
      All activities
      Car Parking
      PO11                                                              AO11
      Sufficient car parking is available to accommodate the number     Parking is provided in accordance with Table 9.4.2.4 of the
      and type of vehicles likely to be generated by the use on site.   Driveways and Parking Code.



     9.3.10.3 Criteria for assessable development assessment (part)
      Performance outcomes                                              Acceptable outcomes

      Extractive Industry
      Demand for extracted material
      PO12                                                              No acceptable outcome provided
      Development for extractive industry services a demonstrated
      local community demand for the extracted material.
      Location
      PO13
      Extractive industry locates in an Extractive Resource Processing No acceptable outcome provided
      Area identified on the Extractive Resource Overlay Maps
      PO14
      Extractive industry is sited to not cause conflict with           No acceptable outcome provided
      incompatible or sensitive land uses.
      PO15
      Extractive industry in proximity to the Noosa River system only   No acceptable outcome provided
      occurs where—
      (a)    there is a clear demonstrated need;



**FINAL DRAFT ­ Post Consultation 2019**                                                                                              Page 3 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.