2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable outcomes
(b) no feasible and prudent alternatives are available; and
(c) it can be demonstrated that the intrinsic natural values
and resources of the river system can be managed and
protected in an ecologically sustainable manner.
Haulage routes
PO16
Haulage routes associated with extractive resources: No acceptable outcome provided
(a) are located on roads where the haulage route will
maintain the safety of the road network and minimise
adverse impacts on premises within the transport route,
particularly residential and urban residential amenity;
(b) avoid conflicts with other land uses;
(c) are located on roads which are of adequate construction
and which may be upgraded as part of the utilisation of
the extractive resource; and
(d) are adequately maintained as a part of the utilisation of
the extractive resource.
PO17
The utilisation of any extractive resource or the rehabilitation of No acceptable outcome provided
the site does not result in adverse visual impacts from major
roads.
Vehicle access and manoeuvring
PO20 No acceptable outcome provided
Vehicle access to, from, and within the extractive industry site:
(a) is adequate for the type and volume of traffic to be
generated;
(b) does not create or worsen any traffic hazard;
(c) ensures disturbance to surrounding land uses is minor
and that impacts from emissions are minimised; and
(d) ensures no tracking of sediment or material onto the
road network results from the transport of materials
associated with the haulage of extractive resources.
Site planning
PO21 No acceptable outcome provided
The design, operation and staging of the extractive industry
promotes the efficient utilisation of the resource.
PO22
The design, operation and staging of the extractive industry No acceptable outcome provided
mitigates vibration, noise, dust, lighting and other impacts on
the surrounding area.
PO23
The design, operation and staging of the extractive industry No acceptable outcome provided
avoids and minimises impacts on ecologically important values
to the greatest extent and where impacts cannot be avoided, the
loss or decrease in values is minimised or offset.
PO24
The design and operation of the extractive industry minimises No acceptable outcome provided
and mitigate impacts on natural fluvial processes and river
bank stability.
PO25
The design, operation and staging of extractive industry No acceptable outcome provided
optimises potential alternative land uses after the cessation of
**FINAL DRAFT Post Consultation 2019** Page 4 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.