Skip to the record
Accept no substitutions.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                                  Acceptable outcomes
      (b)   no feasible and prudent alternatives are available; and
      (c)   it can be demonstrated that the intrinsic natural values
            and resources of the river system can be managed and
            protected in an ecologically sustainable manner.

      Haulage routes
      PO16
      Haulage routes associated with extractive resources:                  No acceptable outcome provided
      (a)   are located on roads where the haulage route will
            maintain the safety of the road network and minimise
            adverse impacts on premises within the transport route,
            particularly residential and urban residential amenity;
      (b)   avoid conflicts with other land uses;
      (c)   are located on roads which are of adequate construction
            and which may be upgraded as part of the utilisation of
            the extractive resource; and
      (d)   are adequately maintained as a part of the utilisation of
            the extractive resource.

      PO17
      The utilisation of any extractive resource or the rehabilitation of   No acceptable outcome provided
      the site does not result in adverse visual impacts from major
      roads.
      Vehicle access and manoeuvring
      PO20                                                                  No acceptable outcome provided
      Vehicle access to, from, and within the extractive industry site:
      (a)   is adequate for the type and volume of traffic to be
            generated;
      (b)   does not create or worsen any traffic hazard;
      (c)   ensures disturbance to surrounding land uses is minor
            and that impacts from emissions are minimised; and
      (d)   ensures no tracking of sediment or material onto the
            road network results from the transport of materials
            associated with the haulage of extractive resources.

      Site planning
      PO21                                                                  No acceptable outcome provided
      The design, operation and staging of the extractive industry
      promotes the efficient utilisation of the resource.
      PO22
      The design, operation and staging of the extractive industry          No acceptable outcome provided
      mitigates vibration, noise, dust, lighting and other impacts on
      the surrounding area.
      PO23
      The design, operation and staging of the extractive industry    No acceptable outcome provided
      avoids and minimises impacts on ecologically important values
      to the greatest extent and where impacts cannot be avoided, the
      loss or decrease in values is minimised or offset.
      PO24
      The design and operation of the extractive industry minimises         No acceptable outcome provided
      and mitigate impacts on natural fluvial processes and river
      bank stability.
      PO25
      The design, operation and staging of extractive industry              No acceptable outcome provided
      optimises potential alternative land uses after the cessation of


**FINAL DRAFT ­ Post Consultation 2019**                                                                     Page 4 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.