Log in to see the plans as drawnPerformance outcomes Acceptable outcomes
PO4 AO4.1
Essential community infrastructure is able to function effectively Development involving essential community infrastructure is not
during and immediately after bushfire events. located within a medium or high bushfire hazard area.
OR
AO4.2
Where located in a medium or high bushfire hazard area,
development involving essential community infrastructure is
designed to function effectively during and after a bushfire event in
accordance with a Bushfire Hazard Management Plan.
Editor’s Note— PSP8 Natural Hazards provides guidance for
assessing bushfire hazard risk and preparing a bushfire hazard
management plan.
Hazardous Materials
PO5 AO5
Public safety and the environment are not adversely affected Hazardous materials are not manufactured or stored in bulk in
by the impacts of bushfire on hazardous materials a bushfire hazard area.
manufacturing or storing in bulk.
Access and Evacuation Routes
PO6 AO6.1
Roads provide for easy and safe evacuation of residents of The road layout provides for throughroads and avoids culde
premises and access by emergency services. sacs and deadend roads.
OR
AO6.2
The development has a perimeter road reserve with a minimum
width of 20 metres and maximum gradient of 12.5%.
OR
AO6.3
Culdesacs or nothrough roads are provided with fire trails or
access easements, which are capable of being navigated by
conventional vehicles and which link to through roads.
AO6.4
Safe access and egress is available at all times to all of the
development for emergency vehicles and personnel.
AO6.5
Where an emergency access point is required, it complies with
the relevant works codes and PSP6 Engineering Design
Standards.
Lot design
**FINAL DRAFT Post Consultation 2019**
Page 13 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.