Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                                 Acceptable outcomes
PO4                                                                  AO4.1
Essential community infrastructure is able to function effectively   Development involving essential community infrastructure is not
during and immediately after bushfire events.                        located within a medium or high bushfire hazard area.

                                                                     OR

                                                                     AO4.2
                                                                     Where located in a medium or high bushfire hazard area,
                                                                     development involving essential community infrastructure is
                                                                     designed to function effectively during and after a bushfire event in
                                                                     accordance with a Bushfire Hazard Management Plan.

                                                                     Editor’s Note— PSP8 Natural Hazards provides guidance for
                                                                     assessing bushfire hazard risk and preparing a bushfire hazard
                                                                     management plan.
Hazardous Materials
PO5                                                                  AO5
Public safety and the environment are not adversely affected         Hazardous materials are not manufactured or stored in bulk in
by the impacts of bushfire on hazardous materials                    a bushfire hazard area.
manufacturing or storing in bulk.
Access and Evacuation Routes
PO6                                                                  AO6.1
Roads provide for easy and safe evacuation of residents of           The road layout provides for through­roads and avoids cul­de­
premises and access by emergency services.                           sacs and dead­end roads.

                                                                     OR

                                                                     AO6.2
                                                                     The development has a perimeter road reserve with a minimum
                                                                     width of 20 metres and maximum gradient of 12.5%.

                                                                     OR

                                                                     AO6.3
                                                                     Cul­de­sacs or no­through roads are provided with fire trails or
                                                                     access easements, which are capable of being navigated by
                                                                     conventional vehicles and which link to through roads.

                                                                     AO6.4
                                                                     Safe access and egress is available at all times to all of the
                                                                     development for emergency vehicles and personnel.

                                                                     AO6.5
                                                                     Where an emergency access point is required, it complies with
                                                                     the relevant works codes and PSP6 Engineering Design
                                                                     Standards.
Lot design




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 13 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.