Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable Outcomes
PO12
Infrastructure activities are designed, constructed and operated in No acceptable outcome provided
a manner that:
(a) minimises energy use and greenhouse gas emissions;
(b) minimises the use of water; and
(c) maximises the reuse and recycling of byproducts
associated with the operation of the utility.
PO13
There are no significant adverse effects on the biodiversity, natural No acceptable outcome provided
vegetation, native wildlife, habitats, landscape quality, water quality
or heritage values, including those related to:
(a) changes to natural drainage; Editor’s Note— PSP10 Effluent Disposal details requirements for
the design and siting of effluent disposal systems where located
(b) disturbance to any of the wetland systems;
outside a sewerage service area. Compliance with PSP10 will be
(c) management of landslide and fire risk; considered as part of Council’s assessment of the plumbing and
(d) erosion and the transport of sediments offsite; drainage application
(e) unmanaged public access;
(f) effluent disposal;
(g) changes to fauna habitat and behaviour; and
(h) disturbance of buildings and features, including natural
features, of heritage significance.
Environment and heritage Table 9.3.8.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Environment and heritage
PO14
Uses are conducted in an environmentally responsible manner, No acceptable outcome provided
operating without deleterious impacts on immediate, surrounding
or downstream communities, environments or environmental
processes.
Hazardous materials
PO15 AO15
Development ensures that public safety and the environment are Materials stored on site are not hazardous or noxious nor
not adversely affected by avoiding the release of hazardous comprise materials that may cause a detrimental effect on the
materials into flood waters and the environment. environment if discharged in a flood event.
Telecommunications Facility Table 9.3.11.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Telecommunications Facility
Amenity
**FINAL DRAFT Post Consultation 2019**
Page 4 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.