Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                                   Acceptable Outcomes
PO7                                                                    AO7.1
Solar farms or roof mounted photo­voltaic panels totalling over        Photo­voltaic solar panels are:
300m2 do not create glare nuisance to roads or surrounding             (a)   setback at least 20 metres from property boundaries; and
areas.
                                                                       (b)   screened by a 1.5 metre wide vegetated buffer of dense
                                                                             vegetation on property boundaries, including tall trees.
                                                                       AO7.2
                                                                       Photo­voltaic solar panels are constructed of dark, light­absorbing
                                                                       materials and covered with an anti­reflective coating enabling as
                                                                       much light as possible to be absorbed and minimising glint and
                                                                       glare.


PO8                                                                    AO8
Infrastructure activities provide an attractive street front address   Where located within urban boundaries:
with unsightly elements screened from view by walls and                (a)   the use has front fences or walls designed and sited to
landscaping.                                                                 contribute to the attractiveness of the streetscape and be
                                                                             compatible with the existing streetscape character;
                                                                       (b)   front fences or walls are setback an average of 1 metre and
                                                                             are articulated to provide visual interest by stepping the
                                                                             design at a maximum of 5 metre intervals; and
                                                                       (c)   planting is provided between the road reserve and any
                                                                             fencing, without creating an impediment for pedestrians
                                                                             using the footpath.

PO9
The generation of spill light by development, avoids significant       No acceptable outcome provided
annoyance, discomfort, distraction or a reduction in the ability to
see essential information.                                             Editor’s Note:­ Refer to Section 3 of AS4282 The Control of the
                                                                       Obtrusive Effects of Outdoor Lighting for advice in relation to the
                                                                       design, installation and maintenance of lighting.


Safety and security             Table 9.3.11.3 Criteria for assessment (part)
Performance outcomes                                                   Acceptable Outcomes

Safety and security
PO10
Infrastructure activities avoid or effectively manage emissions of No acceptable outcome provided
light, noise, vibration or radiation beyond the site such
that environmental nuisance to occupants or users of surrounding
premises is not caused.
PO11                                                                   AO11
Unacceptable risks to public safety are avoided.                       Public and unauthorised access is restricted.


Environmental Management                     Table 9.3.11.3 Criteria for assessment (part)
Performance outcomes                                                   Acceptable Outcomes

Environmental Management




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                   Page 3 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.