Log in to see the plans as drawn9.4.2 Earthworks Code
9.4.2.1 Application
(1) This code applies to assessable development identified as requiring assessment against the Earthworks code by the tables of
assessment in Part 5 (Tables of Assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
9.4.2.2 Purpose and Overall Outcomes
(1) The purpose of the Earthworks code is to ensure earthworks do not unreasonably impact on the natural environment or
other properties and provide a safe and secure work environment.
(2) The overall outcomes sought for the Earthworks code are:
(a) Earthworks are designed and constructed to be structurally sound.
(b) All onsite works provide land stability (including differential settlement or expansion in reactive soils).
(c) Earthworks avoid contamination of land.
(d) Flooding and drainage are appropriately addressed.
(e) Groundwater, watercourses and wetlands are protected.
(f) The loss of native remnant or regrowth vegetation is avoided.
Table 9.4.2.3 Criteria for assessment
Effects of works Table 9.4.2.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Assessable Development
Effects of works
Drainage
PO1 AO1
Finished surface levels ensure land is free draining. Filled or excavated areas have a minimum gradient of 0.5%
and drain to Council’s stormwater infrastructure where
available, or where stormwater infrastructure is not available,
toward the street.
Hydraulics
PO2
Change to the levels on site do not have an adverse impact on No acceptable outcome provided
the flooding and drainage characteristics offsite.
**FINAL DRAFT Post Consultation 2019**
Page 1 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.