Skip to the record
Accept no imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                              Acceptable Outcomes

Geotechnical considerations
PO3                                                               AO3.1
Earthworks do not result in geotechnical instability on­site or   Filling works are undertaken in accordance with Council’s
to nearby premises.                                               Planning Scheme Policy PSP6 Engineering design standards
                                                                  ­ roads, drainage and earthworks.

                                                                  AO3.2
                                                                  Where the filling is for residential, commercial or industrial
                                                                  purposes the works comply with Australian Standard ­
                                                                  Guidelines for earthworks on commercial & residential
                                                                  development.
Local amenity
PO4                                                               AO4.1
Undertaking earthworks does not adversely impact on the           The following control measures are implemented—
amenity of the local area by way of dust, noise or visual         (a)   regular water spraying of exposed areas to suppress
amenity.                                                                dust;
                                                                  (b)   provision of dust stabilised or sealed internal roads;
                                                                  (c)   protective covering of exposed areas that are left for
                                                                        more than 2 weeks; and
                                                                  (d)   unless a development permit provides otherwise,
                                                                        disturbed areas are revegetated using species identified
                                                                        in Council's Planning Scheme Policy PSP2
                                                                        Landscaping.

                                                                  AO4.2
                                                                  Earthworks are undertaken only during the hours of 7:00am to
                                                                  6:00pm, Monday to Friday and 7:00am to 3:00pm on
                                                                  Saturday. No work is undertaken on Sunday or public
                                                                  holidays.
Vegetative waste
PO5                                                               AO5.1
Vegetation cleared from a development site is disposed of in      Cleared vegetation is transported off­site for disposal in an
an environmentally responsible manner.                            approved green waste disposal facility.

                                                                  AO5.2
                                                                  Cleared vegetation is mulched on­site and reused for
                                                                  landscaping of the finished development.

                                                                  AO5.3
                                                                  Cleared vegetation is disposed of for the purpose of firewood.

                                                                  AO5.4
                                                                  Disposal of vegetative waste by burning off is avoided.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                            Page 2 of 4
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.