Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                             Acceptable Outcomes

Dams
PO12                                                             AO12.1
Dam location and construction does not impact upon               Where the site is in the Rural zone—
neighbouring properties or road reserves, in terms of—           (a)   the land has a slope of less than 25% (1:4);
(a)   hydrology;                                                 (b)   the earthworks including cut and fill batters and retaining
(b)   alteration of existing overland flow paths and patterns;         walls are setback a minimum of 50 metres from the
(c)   landslide or failure of dam wall; and                            property boundary; and

(d)   effluent disposal areas.                                   (c)   the size of the lot is greater than 5 hectares.

                                                                 AO12.2
                                                                 Where the site is in the Rural residential zone or the Rural
                                                                 zone and the lot is less than 5 hectares:
                                                                 (a)   the land has a slope of less than 1:6;
                                                                 (b)   the earthworks including cut and fill batters and retaining
                                                                       walls are setback a minimum of 20 metres from the
                                                                       property boundary; and
                                                                 (c)   the dam work involves less than 500m³ of material.

                                                                 AO12.3
                                                                 For all other zones—
                                                                 No acceptable outcome provided




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                         Page 4 of 4
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.