Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn9.4.3 Existing Services Code
9.4.3.1 Application
(1) This code applies to assessable development identified as requiring assessment against the Existing Service Code by the tables
of assessment in Part 5 (Tables of Assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
9.4.3.2 Purpose and Overall Outcomes
(1) The purpose of the Existing Services Code is to ensure existing underground infrastructure is protected from damage
caused by development.
(2) The overall outcomes sought for the Existing services code are:
(a) Underground infrastructure is accessible for maintenance purposes.
(b) Existing services are identified and methods of protection and access are implemented in the design of the development.
Table 9.4.3.3 Criteria for assessment
Setbacks, easements and maintenance Table 9.4.3.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Assessable development
PO1 No acceptable outcome provided
Development near a stormwater drain, overland flow path or
associated structure does not—
(a) adversely affect the function of the service;
(b) place an additional load on the service; and
(c) unduly increase future maintenance costs.
PO2 AO2.1
Maintenance access is provided to all stormwater drains, overland For trunk infrastructure, a registered easement in favour of Council
flow paths and associated structures. is created over all underground infrastructure located in private
property.
AO2.2
The width of the easement required is in accordance with
Council’s Planning Scheme Policy PSP6 Engineering Design
Standards – Roads, drainage and earthworks.
AO2.3
The easement is centred over the centreline of the infrastructure.
**FINAL DRAFT Post Consultation 2019**
Page 1 of 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.