Log in to see the plans as drawnPerformance outcomes Acceptable outcomes
PO6 AO6.1
Rear fences adjacent to the beachfront within the Coastal Rear fences adjacent to the beachfront within the Coastal
Protection Area are designed and sited to be sympathetic with the Protection Area incorporate the following—
visual amenity of the beachfront and do not degrade the natural (a) height of no more than 1.2 metres; and
beachfront character.
(b) open construction (ie at least 50% transparent);
(c) lightweight materials (eg. timber); and
(d) dark colours to blend with the natural landscape.
AO6.2
Gates are not installed in fences as direct access to the
beachfront does not occur.
AO6.3
Only beach access points for use by the community are
constructed.
Figure 8.2.4.4 Coastal Building Lines
8.2.5 Extractive Resources Overlay Code
8.2.5.1 Application
(1) This code applies to assessable development:
(a) subject to the Extractive Resource Areas Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
(b) identified as requiring assessment against the Extractive Resources overlay code by the tables of assessment in Part 5
(Tables of assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
8.2.5.2 Purpose and overall outcomes
(1) The purpose of the Extractive Resources overlay code is to protect extractive resource areas and transport routes from
development that is not compatible with extractive industry operations and to minimise land use conflicts between the extractive
**FINAL DRAFT Post Consultation 2019**
Page 17 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.