Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn industry operation and other activities in the vicinity of extractive resource areas.
(2) The overall outcomes sought for the Extractive Resources overlay code are:
(a) Development does not adversely affect or impede extraction of resources from extractive resource areas.
(b) Development ensures that extractive resource separation areas and transport route separation areas are not encroached
upon by incompatible development that could affect or impede extraction or haulage of resources.
(c) Development, other than for an extractive industry, is buffered from and is able to mitigate impacts likely to occur as a result
of an extraction of resources from an extractive resource area.
(d) A high level of amenity for residents and land uses in the vicinity of extractive industry operations and transport routes is
maintained.
Table 8.2.5.3 Criteria for assessable development
Performance outcomes Acceptable outcomes
Development within Resource Processing Areas
PO1 AO1
Development within the resource/processing area does not Development within the resource processing area is for:
constrain, prevent or otherwise interfere with the winning or (a) extractive industry uses;
processing of extractive resources.
(b) uses that are directly associated with an extractive industry;
or
(c) temporary or nonintensive uses that are compatible with
future extractive industry operations.
Development within Extractive Resource Processing / Separation Areas
**FINAL DRAFT Post Consultation 2019**
Page 18 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.