Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      industry operation and other activities in the vicinity of extractive resource areas.
(2)   The overall outcomes sought for the Extractive Resources overlay code are:
      (a)   Development does not adversely affect or impede extraction of resources from extractive resource areas.
      (b)   Development ensures that extractive resource separation areas and transport route separation areas are not encroached
            upon by incompatible development that could affect or impede extraction or haulage of resources.
      (c)   Development, other than for an extractive industry, is buffered from and is able to mitigate impacts likely to occur as a result
            of an extraction of resources from an extractive resource area.
      (d)   A high level of amenity for residents and land uses in the vicinity of extractive industry operations and transport routes is
            maintained.



Table 8.2.5.3 ­ Criteria for assessable development
Performance outcomes                                                    Acceptable outcomes

Development within Resource Processing Areas
PO1                                                                     AO1
Development within the resource/processing area does not                Development within the resource processing area is for:
constrain, prevent or otherwise interfere with the winning or           (a)    extractive industry uses;
processing of extractive resources.
                                                                        (b)    uses that are directly associated with an extractive industry;
                                                                               or
                                                                        (c)    temporary or non­intensive uses that are compatible with
                                                                               future extractive industry operations.

Development within Extractive Resource Processing / Separation Areas




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 18 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.