Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                             Acceptable Outcomes
PO12                                                             AO12.1
Road infrastructure is located and aligned so as to—             Roads follow the edge of existing disturbed areas, or
(a)   minimise disturbance to native vegetation and/or other     alternatively, these works are co­located with other services
      habitat areas;                                             within a combined utility corridor.

(b)   protect and maintain wildlife corridor movements and the
                                                                 AO12.2
      safety of native fauna;
                                                                 Low impact construction techniques are used around areas of
(c)   provide for compensatory habitat establishment and         vegetation to be retained to minimise interference with the
      maintenance;                                               vegetation.
(d)   minimise changes to the hydrological regime, including
      drainage patterns, run­off and water quality;              AO12.3
                                                                 Roads avoid native vegetation and provide appropriate fauna
(e)   avoid crossing watercourses, drainage lines and
                                                                 movement corridors and protection measures.
      wetlands, but where such crossings are unavoidable,
      disturbed areas are reinstated and revegetated on
                                                                 Editor’s Note— Measures may include fauna underpasses,
      completion of works; and
                                                                 ropes, fencing and the like.
(f)   minimise bulk earthworks.
                                                                 AO12.4
                                                                 Road infrastructure within or adjacent to native habitat
                                                                 incorporates fences which allow for protected wildlife movement
                                                                 and controls unrestricted access of domestic cats and dogs.

                                                                 AO12.5
                                                                 Native vegetation is protected from clearing or construction
                                                                 activities by—
                                                                 (a)   clearly marking vegetation to be retained with flagging
                                                                       tape;
                                                                 (b)   installing protective fencing around the dripline of
                                                                       vegetation; and
                                                                 (c)   ensuring stock piling, storage and vehicle parking occur
                                                                       outside the areas of vegetation to be retained.

                                                                 AO12.6
                                                                 Where clearance of habitat is unavoidable, once the area
                                                                 disturbed by the works is re­established, replacement habitat is
                                                                 planted in proximity of the works to create native fauna habitat
                                                                 suitable for the area and maintained for the life of the works.
PO13                                                             AO13
Road infrastructure is constructed to minimise adverse           Road infrastructure is constructed in accordance with Council’s
environmental impacts, including from run­off and erosion.       Planning Scheme Policy PSP6 Engineering Design Standards –
                                                                 Roads, drainage and earthworks




External Works and Infrastructure                Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes                                             Acceptable Outcomes
External Works and Infrastructure




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 7 of 8
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.