Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                              Acceptable outcomes
PO2                                                               AO2.1
Development within the resource processing/separation area:       Development does not result in the creation of additional lots
(a)   does not increase the number of people living in the        used or capable of being used for residential purposes.
      separation area;
                                                                  AO2.2
(b)   incorporates measures to avoid or mitigate adverse
                                                                  Where realigning boundaries, the development does not worsen
      impacts from the extracting and transporting of the
                                                                  the situation with respect to the distance between available house
      extractive resource; and
                                                                  sites and the resource processing area.
(c)   does not compromise the function of the separation area in
      providing a buffer between the extractive industry and other AO2.3
      incompatible uses beyond the separation area.                Development does not result in an increase in the scale or density
                                                                   of residential uses within a resource/processing separation area;

                                                                  OR

                                                                  AO2.4
                                                                  Development within the extractive resource separation area
                                                                  incorporates design, orientation and construction materials that
                                                                  mitigate potential adverse effects from an existing or future
                                                                  extractive industry;

                                                                  OR

                                                                  AO2.5
                                                                  Development within the extractive resource separation area
                                                                  operates outside the normal hours of operation for existing or
                                                                  future extractive industry activities.

                                                                  AO2.6
                                                                  Extractive industry development does not occur within the
                                                                  extractive resource separation area.

                                                                  OR

                                                                  AO2.7
                                                                  Where extractive industry development occurs within the extractive
                                                                  resource separation area, the extractive industry does not impact
                                                                  on sensitive land uses located within or outside of the extractive
                                                                  resource separation area.

                                                                  Editor’s Note—Where lots have land both within and outside the
                                                                  separation area, a residential use of the lot may be approved
                                                                  provide dwellings are located outside the separation areas. Plans
                                                                  lodged with Council shall include building envelopes that identify
                                                                  the location of the dwelling.
Development within Transport Route Separation Areas




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                         Page 19 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.