Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                              Acceptable Outcomes
PO8                                                               AO8.1
Water quality treatment infrastructure to be dedicated as         Detailed life cycle costing is provided for the entire treatment train
public assets are proven to be suitable for its use and of a      system including replacement costs of asset parts.
cost effective and efficient standard.
                                                                  AO8.2 Treatment systems dedicated as public assets are
                                                                  designed to minimise maintenance, renewal and adaption costs
                                                                  and the requirement for specialised equipment, material or
                                                                  maintenance techniques.

                                                                  AO8.3
                                                                  Vegetated stormwater management systems to be dedicated as
                                                                  public assets are established and maintained during the
                                                                  maintenance period to ensure optimal vegetated growth and that
                                                                  the functional elements of the system achieve the design function
                                                                  at the end of the maintenance period.
PO9                                                             AO9.1
Treatment systems are designed to eliminate or minimise health, Free draining inlets and outlets are provided to ensure that waters
safety and aesthetic hazards, including risks associated with   do not pond for more than 24 hours.
insect breeding, odour and public safety.
                                                                AO9.2
                                                                Developments are designed to eliminate retaining walls in excess
                                                                of 0.8m for any water quality treatment device.


Hydrology and waterway stability                Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes                                              Acceptable Outcomes
Hydrology and waterway stability
PO10                                                              AO10
Development prevents increased bed and bank erosion and           The development is designed to:
sedimentation in receiving waterways by avoiding changes in low   (a)   limit the peak 1 year ARI event discharge within the
rate, peak flow run­off and flow duration.                              receiving waterway to the pre­development peak 1 year
                                                                        discharge;
                                                                  (b)   maximise pervious areas by using pervious alternatives for
                                                                        otherwise impervious areas wherever possible;
                                                                  (c)   provide for capture and reuse of stormwater for non­potable
                                                                        purposes for gardening, toilet flushing, laundry and hot
                                                                        water supply uses;
                                                                  (d)   incorporate appropriate detention features; and
                                                                  (e)   incorporate natural channel design principles

                                                                  Editor’s note: The Sustainable Building Design Code includes
                                                                  requirements for stormwater capture and reuse.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 4 of 8
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.