Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes
PO8 AO8.1
Water quality treatment infrastructure to be dedicated as Detailed life cycle costing is provided for the entire treatment train
public assets are proven to be suitable for its use and of a system including replacement costs of asset parts.
cost effective and efficient standard.
AO8.2 Treatment systems dedicated as public assets are
designed to minimise maintenance, renewal and adaption costs
and the requirement for specialised equipment, material or
maintenance techniques.
AO8.3
Vegetated stormwater management systems to be dedicated as
public assets are established and maintained during the
maintenance period to ensure optimal vegetated growth and that
the functional elements of the system achieve the design function
at the end of the maintenance period.
PO9 AO9.1
Treatment systems are designed to eliminate or minimise health, Free draining inlets and outlets are provided to ensure that waters
safety and aesthetic hazards, including risks associated with do not pond for more than 24 hours.
insect breeding, odour and public safety.
AO9.2
Developments are designed to eliminate retaining walls in excess
of 0.8m for any water quality treatment device.
Hydrology and waterway stability Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Hydrology and waterway stability
PO10 AO10
Development prevents increased bed and bank erosion and The development is designed to:
sedimentation in receiving waterways by avoiding changes in low (a) limit the peak 1 year ARI event discharge within the
rate, peak flow runoff and flow duration. receiving waterway to the predevelopment peak 1 year
discharge;
(b) maximise pervious areas by using pervious alternatives for
otherwise impervious areas wherever possible;
(c) provide for capture and reuse of stormwater for nonpotable
purposes for gardening, toilet flushing, laundry and hot
water supply uses;
(d) incorporate appropriate detention features; and
(e) incorporate natural channel design principles
Editor’s note: The Sustainable Building Design Code includes
requirements for stormwater capture and reuse.
**FINAL DRAFT Post Consultation 2019**
Page 4 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.