Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes
PO11 AO11.1
Water sensitive urban design principles are applied to achieve The design and construction of a natural channel or natural
multifunctional design of waterways, wetlands and drainage lines channel rehabilitation works are in accordance with the Natural
that provide for: Channel Design Guidelines (Brisbane City Council) having regard
(a) stormwater conveyance that uses natural channel design; to local topography, geology and geomorphology.
(b) protection of landscape features and ecological important
AO11.2
areas including terrestrial and aquatic habitat;
Landscape features, plant species and habitat types used in
(c) aesthetic and passive recreation values; stormwater conveyance channels are complementary to the local
(d) flood management and conveyance of external catchment context and natural waterways.
stormwater through the development;
AO11.3
(e) landscaping that incorporates local native species; and
Bank and bed stability and planting densities result in a stable
(f) bed and bank stability. channel over the long term and minimal potential for pest plant
species.
AO11.4
Water Sensitive Design measures are incorporated into the
development, as detailed in the document Water Sensitive
Designs small improvements, new ideas, concepts and sketch
designs for stormwater filtration systems (Healthy Waterways
Water by Design).
AO11.5
Floodplain management is designed in accordance with the
Framework for the Integration of Flood and Stormwater
Management into Open Space published by Healthy Waterways
Water by Design (version current at the time of development
application)
PO12 AO12.1
Development protects instream ecology by maintaining pre Where runoff from or within the site passes through or drains to
development low flow discharge regimes and maintaining fish natural channels, waterways or wetlands, development protects in
passages. steam ecology by maintaining predevelopment low flow
discharge regimes in accordance with the frequent flow
management objectives in PSP6 Engineering Design Standards
Roads, drainage and earthworks
AO12.2
Instream structures such as roads, bridges, culverts, and other
stormwater infrastructure do not cause barriers to fish passage
and facilitate the movement of terrestrial and aquatic fauna along
waterway corridors.
AO12.3
Benthic substrate retains a continuous grade with the direction
of flow consistent with the natural bed profile.
**FINAL DRAFT Post Consultation 2019**
Page 5 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.