Log in to see the plans as drawnConstruction and establishment of stormwater management
systems
PO14 AO14.1
Construction methods provide for appropriate controls to avoid An erosion and sediment control plan prepared in accordance
entry and transport of litter, sediment, and associated with the International Erosion Control Association Best Practice
Books demonstrates that the capture and release of stormwater
prescribed water contaminants into receiving waters.
achieves the design objectives listed in Table A: Construction
phase – stormwater management design objectives of the State
Editor's note— Water contaminants are prescribed in the Planning Policy (Appendix 2).
Environmental Protection Act 1994.
Editor’s note— PSP6 Engineering Design Standards Roads,
drainage and earthworks provides guidance on requirements for
preparing an Erosion Management Plan.
AO14.2
Construction works are designed and managed to restrict the
extent of clearing and soil exposure to the minimum necessary for
access, and safe construction at any one time.
AO14.3
For buildings:
(a) upstream runoff is diverted around the construction site;
(b) sediment barriers are provided downslope of disturbed
areas to prevent sediment washing into gutters, drains and
waterways , wetlands or drainage lines either on or off the
site; and
(c) temporary or permanent downpipes are connected to the
stormwater system before laying the roof; or
(d) localised erosion is avoided by directing flow from
downpipes over nonerosive areas.
AO14.4
Chemical flocculants used as part of an erosion and sediment
control plan do not harm the environmental values within
receiving waters.
AO14.5
Appropriately sized litter containment areas, with provision for
sorting recyclables are provided for the type of litter expected to be
generated onsite.
Wastewater management and effluent disposal Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Wastewater management and effluent disposal
**FINAL DRAFT Post Consultation 2019**
Page 7 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.