2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Construction and establishment of stormwater management
systems
PO14                                                             AO14.1
Construction methods provide for appropriate controls to avoid   An erosion and sediment control plan prepared in accordance
entry and transport of litter, sediment, and associated          with the International Erosion Control Association Best Practice
                                                                 Books demonstrates that the capture and release of stormwater
prescribed water contaminants into receiving waters.
                                                                 achieves the design objectives listed in Table A: Construction
                                                                 phase – stormwater management design objectives of the State
Editor's note— Water contaminants are prescribed in the          Planning Policy (Appendix 2).
Environmental Protection Act 1994.
                                                                 Editor’s note— PSP6 Engineering Design Standards ­ Roads,
                                                                 drainage and earthworks provides guidance on requirements for
                                                                 preparing an Erosion Management Plan.

                                                                 AO14.2
                                                                 Construction works are designed and managed to restrict the
                                                                 extent of clearing and soil exposure to the minimum necessary for
                                                                 access, and safe construction at any one time.

                                                                 AO14.3
                                                                 For buildings:
                                                                 (a)   upstream runoff is diverted around the construction site;
                                                                 (b)   sediment barriers are provided downslope of disturbed
                                                                       areas to prevent sediment washing into gutters, drains and
                                                                       waterways , wetlands or drainage lines either on or off the
                                                                       site; and
                                                                 (c)   temporary or permanent downpipes are connected to the
                                                                       stormwater system before laying the roof; or
                                                                 (d)   localised erosion is avoided by directing flow from
                                                                       downpipes over non­erosive areas.

                                                                 AO14.4
                                                                 Chemical flocculants used as part of an erosion and sediment
                                                                 control plan do not harm the environmental values within
                                                                 receiving waters.

                                                                 AO14.5
                                                                 Appropriately sized litter containment areas, with provision for
                                                                 sorting recyclables are provided for the type of litter expected to be
                                                                 generated onsite.


Wastewater management and effluent disposal                      Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes                                             Acceptable Outcomes
Wastewater management and effluent disposal




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 7 of 8
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.