Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                              Acceptable Outcomes

PO13                                                              AO13.1
Development is designed and constructed to maintain surface       The location and form of stormwater discharge points do not alter
and ground water balances that sustain the environmental values   the pre­development hydrology of receiving surface water or
of water dependent ecosystems, including downstream aquatic,      groundwater.
riparian, wetland and terrestrial ecosystems.
                                                                  AO13.2
                                                                  Developments located on groundwater recharge or discharge
                                                                  areas are designed and managed in accordance with a
                                                                  groundwater recharge and discharge management plan prepared
                                                                  by a suitably experienced and qualified groundwater hydrologist.
                                                                  The groundwater recharge or discharge must demonstrate that
                                                                  the development does not affect groundwater balances beyond
                                                                  the property boundaries.

                                                                  Editor's Note— PSP6 Engineering Design Standards ­ Roads,
                                                                  drainage and earthworks provides guidance on prepare a
                                                                  groundwater recharge and discharge plan.



Construction and establishment of stormwater management systems                                  Table 9.4.8.3 Criteria for
assessment (part)
Performance Outcomes                                              Acceptable Outcomes




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                          Page 6 of 8
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.