Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Character, amenity & access ­ prescribed tidal works outside Noosa Waters Estate
Site Responsive Design
PO9                                                            AO9.1
Prescribed tidal works are designed and sited to ensure—       For lots with waterway frontage greater than 15 metres in width,
(a)   they are contained within the prolongation of boundaries jetties and pontoons are setback a minimum of 3 metres from the
                                                               prolongation of the boundaries (Refer Figure 9.4.9.3A).
      of the lot;
(b)   that when a vessel is berthed it does not encroach over  AO9.2
      the prolongation of boundaries of the lot;               For lots with waterway frontage of less than 15 metres in width
(c)   a high level of visual amenity is maintained when viewed (including lots located in waterway bends or at the head of the
                                                               waterway)—
      from the waterway and adjoining lands;
                                                                   (a)   a joint application is made with the adjoining owner; or
(d)   they avoid conflicts with uses in the water and on the
                                                                   (b)   where a joint application is not possible, jetties and
      foreshore and adjoining lands;
                                                                         pontoons—
(e)   cluttering of waterways is avoided;                                        are setback a minimum of 1 metre from the
                                                                         (i)
(f)   public access to beaches and foreshores is not                             prolongation of the boundaries;
      impeded, including the pocket sandy beaches and other              (ii)    are not more than 1.2 metres in width; and
      foreshores along the Noosa River;                                  (iii)   have no head and are located such that when a
(g)   excessive traffic volumes within foreshore areas and                       vessel is berthed, it does not encroach over the
      adjoining lands are avoided;                                               prolongation of a boundary (Refer Figure 9.4.9.3B).

(h)   materials blend with the natural surrounds; and
                                                                   AO9.3
(i)   they reflect the character and setting of the immediate      For lots that adjoin those described in AO9.2, a jetty or pontoon is
      surrounds of the locality.                                   located well away from the common boundary.

PO10
Jetties and wharves are not roofed.                                No acceptable outcome provided
PO11
Boat lifting devices (including boat storage devices) are only     No acceptable outcome provided
located to services properties on Noosa North Shore.
PO12
Large jetties, pontoons and wharves that are capable of serving    No acceptable outcome provided
other uses, such as for private recreational purposes, are not
developed.


Design, Construction and Safety ­ jetties, wharves and pontoons                              Table 9.4.9.3 Criteria for
assessment (part)
Performance Outcomes                                               Acceptable Outcomes
Design, Construction and Safety for jetties, wharves and pontoons ­ prescribed tidal works outside Noosa Waters Estate
PO13                                                               AO13.1
Prescribed tidal works are designed and constructed for the sole   The maximum width of a jetty, jetty head or associated walkway is
purpose of providing access to vessels and are sited and           1.5 metres, except on Noosa North Shore.
designed to avoid—
(a)   cluttering of waterways;                                     AO13.2
                                                                   For jetties on Noosa North Shore, the maximum width of the jetty
(b)   excessive traffic volumes within foreshore areas and
                                                                   head is 2 metres.
      adjoining lands;
(c)   conflicts with uses on the foreshore and adjoining lands;    AO13.3
      and                                                          The maximum length of a jetty head is not more than 7 metres.
(d)   unacceptable risks to personal and public safety.
                                                                   AO13.4
                                                                   A pontoon head has a maximum width of 3 metres and a
                                                                   maximum length of 5 metres (Refer Figure 9.4.9.3C).



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 3 of 16
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.