2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                                Acceptable Outcomes
PO16                                                                AO16.1
Works are designed and sited to ensure—                             For lots with watercourse frontage greater than 15 metres in width,
(a)   they are contained within the prolongation of boundaries of   jetties are setback a minimum of 3 metres from the prolongation
      the lot;                                                      of the boundaries (Refer Figure 9.4.9.3A).

(b)   that when a vessel is berthed it does not encroach over the
                                                                    AO16.2
      prolongation of boundaries of the lot;
                                                                    For lots with watercourse frontage less than 15 metres in width
(c)   a high level of visual amenity is maintained when viewed      (including lots located in watercourse bends or at the head of the
      from the watercourse and adjoining lands;                     watercourse)—
(d)   the works avoid conflicts with uses in the water, on the      (a)   a joint application is made with the adjoining owner; or
      foreshore and adjoining lands;                                      where a joint application is not possible, jetties—
                                                                    (b)
(e)   materials blend with the natural surrounds;                         (i)     are setback a minimum of 1 metres from the
(f)   cluttering of watercourses is avoided;                                      prolongation of the boundaries;
(g)   excessive traffic volumes within foreshore areas, on                (ii)    are not more than 1.5 metres in width;
      adjoining lands and in the water are avoided; and                   (iii)   have no jetty head;
(h)   they reflect the character and setting of the work’s                (iv)    allow for safe access and manoeuvrability of vessels
      immediate surrounds of the locality.                                        for both the neighbouring property and the subject
                                                                                  property; and
                                                                          (v)     are not constructed on sites where there is an
                                                                                  existing shared jetty on either prolongation of the
                                                                                  side property boundaries.


                                                                    AO16.3
                                                                    For lots that adjoin those described in AO16.2, the jetty is located
                                                                    well away from the common boundary.


PO17
Landings are not roofed.                                            No acceptable outcome provided


Design, Construction and Safety ­ Jetties                    Table 9.4.9.3 Criteria for assessment (part)
Performance Outcomes                                                Acceptable Outcomes
Design, Construction and Safety for Jetties within Noosa Waters Estate waterways
PO18                                                            AO18
Structures such as handrails, light bollards, piers and pumping No acceptable outcome provided.
equipment for semi­submersible floating docks have a maximum
height of 1100mm above the jetty floor.
PO19                                                            AO19.1
Development is designed and constructed for the sole purpose of Jetties—
providing access to vessels and are sited and designed to avoid (a)    are a maximum width of 1.5 metres;
—
                                                                (b)    a maximum length of a jetty head is not more than 7 metres
(a)   cluttering of waterways;                                         (Refer Figure 9.4.9.3C);
(b)   excessive traffic volumes within foreshore areas, on      (c)    constructed predominantly of timber;
      adjoining lands and within the waterway; and
                                                                (d)    are not constructed parallel to the revetment wall; and
(c)   unacceptable risks to personal and public safety.                extend a maximum of 10 metres past the quayline.

                                                                    AO19.2
                                                                    For “Y” and “T” shaped jetty heads or other shaped jetty heads—
                                                                    (a)   a maximum area of 10.5m² excluding any walkway is
                                                                          provided; and
                                                                    (b)   a walkway with a minimum length of 3 metres is provided to


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                Page 6 of 16
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.