Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes
Design, Construction and Safety for Boat Ramps prescribed tidal works outside Noosa Waters Estate
PO14 AO14.1
Boat ramps are designed and constructed to— Where there is an existing revetment wall—
(a) allow access by a wheeled boat trailer; (a) the level of a boat ramp surface at the revetment wall is
(b) ensure that unacceptable risks to personal and public no more than 150 millimetres above the top of the wall,
safety are unlikely to be caused; not more than 500 millimetres below the top of the wall
(c) avoid cluttering of the waterways; and not more than 200 millimetres above the existing
(d) avoid excessive traffic volumes within foreshore areas and beach;
adjoining lands; and (b) the ramp extends into the waterway no more than 9
(e) ensure that visual amenity of the foreshore is maintained. metres from a revetment wall;
(c) the ramp is constructed at a uniform grade no steeper
than 20% (1 in 5); and
(d) the outer end of the ramp is no more than 100
millimetres above the level of the beach (Refer Figure
9.4.9.3E).
AO14.2
No part of the ramp is to extend closer than 1 metre to the
prolongation of the boundaries.
AO14.3
The boat ramp surface profile is concave to allow concentration of
water to the centre of the ramp.
PO15
No new boatramps are constructed within the Noosa River No acceptable outcome provided.
system.
Character and amenity Table 9.4.9.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Character and amenity operational works within Noosa Waters Estate waterways
**FINAL DRAFT Post Consultation 2019**
Page 5 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.