Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn risk, taking into account the predicted effects of climate change;
(b) ensure that risk to life, property, community, economic activity and the environment during flood and storm tide inundation
events is avoided or mitigated; and
(c) ensure that development does not increase potential for flood damage onsite or to other property.
(2) The overall outcomes sought for the Flood Hazard overlay code are:
(a) Development in areas at risk from flood and storm tide inundation is compatible with the nature of the defined flood event or
defined storm tide event.
(b) Development protects floodplains and the flood conveyance capacity of waterways.
(c) Development is resilient to flood and storm tide events by ensuring siting and design responds to and minimises potential
risks of flood and storm tide inundation to people and property.
(d) Development directly, indirectly and cumulatively avoids an unacceptable increase in the extent or severity of flood or storm
tide inundation and does not significantly increase the potential for damage on the site or to other properties.
(e) Development supports and does not unduly burden disaster management response or recovery capacity and capabilities.
(f) Development avoids the release of hazardous materials as a result of a flood event.
(g) Natural processes and the protective function of landforms and vegetation are maintained in flooding and inundation areas.
Table 8.2.6.3 Criteria for assessable development
Performance outcomes Acceptable outcomes
Floodplain protection, immunity and safety for development areas
PO1 AO1
Development provides that for all flood events up to and The finished flood level is not less than the minimum design
including the DFE : levels specified in Table 8.2.6.4
﴾a﴿ the safety of people on the site is protected; and
﴾b﴿ the risk of damage to property on the site is avoided or
minimised as far as practicable.
PO2 AO2
All lots have sufficient area that is above the DFE flood level or The minimum area above flood level (flood free area) for each
where modelling is not available, the highest recorded flood lot, is in accordance with Table 8.2.6.5.
level, to safely and adequately accommodate the intended
use.
PO3 PO3
For reconfiguring a lot or operational works, development is Flood immunity for development areas is not achieved by filling
undertaken in a manner that ensures: land below the 1%AEP flood level.
﴾a﴿ natural hydrological systems are protected from erosion,
scour or flood damage on the premises or other OR
premises;
Where flood modelling is not available, flood immunity for
﴾b﴿ natural landforms and drainage lines are maintained to
development areas is not achieved by filling land below the
protect the hydraulic performance of waterways and
highest recorded flood level.
flood plain; and
﴾c﴿ development integrates with the natural landform rather
than modifying the landform to suit the development as
far as practicable.
**FINAL DRAFT Post Consultation 2019**
Page 21 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.