Skip to the record
Accept no imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
            risk, taking into account the predicted effects of climate change;
      (b)   ensure that risk to life, property, community, economic activity and the environment during flood and storm tide inundation
            events is avoided or mitigated; and
      (c)   ensure that development does not increase potential for flood damage on­site or to other property.

(2)   The overall outcomes sought for the Flood Hazard overlay code are:
      (a)   Development in areas at risk from flood and storm tide inundation is compatible with the nature of the defined flood event or
            defined storm tide event.
      (b)   Development protects floodplains and the flood conveyance capacity of waterways.
      (c)   Development is resilient to flood and storm tide events by ensuring siting and design responds to and minimises potential
            risks of flood and storm tide inundation to people and property.
      (d)   Development directly, indirectly and cumulatively avoids an unacceptable increase in the extent or severity of flood or storm
            tide inundation and does not significantly increase the potential for damage on the site or to other properties.
      (e)   Development supports and does not unduly burden disaster management response or recovery capacity and capabilities.
      (f)   Development avoids the release of hazardous materials as a result of a flood event.
      (g)   Natural processes and the protective function of landforms and vegetation are maintained in flooding and inundation areas.

Table 8.2.6.3 ­ Criteria for assessable development
Performance outcomes                                                  Acceptable outcomes
Floodplain protection, immunity and safety ­ for development areas

PO1                                                                   AO1
Development provides that for all flood events up to and              The finished flood level is not less than the minimum design
including the DFE :                                                   levels specified in Table 8.2.6.4
﴾a﴿    the safety of people on the site is protected; and
﴾b﴿    the risk of damage to property on the site is avoided or
       minimised as far as practicable.


PO2                                                                AO2
All lots have sufficient area that is above the DFE flood level or The minimum area above flood level (flood free area) for each
where modelling is not available, the highest recorded flood       lot, is in accordance with Table 8.2.6.5.
level, to safely and adequately accommodate the intended
use.


PO3                                                                   PO3
For reconfiguring a lot or operational works, development is          Flood immunity for development areas is not achieved by filling
undertaken in a manner that ensures:                                  land below the 1%AEP flood level.
﴾a﴿    natural hydrological systems are protected from erosion,
       scour or flood damage on the premises or other           OR
       premises;
                                                                Where flood modelling is not available, flood immunity for
﴾b﴿    natural landforms and drainage lines are maintained to
                                                                development areas is not achieved by filling land below the
       protect the hydraulic performance of waterways and
                                                                highest recorded flood level.
       flood plain; and
﴾c﴿    development integrates with the natural landform rather
       than modifying the landform to suit the development as
       far as practicable.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 21 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.