Log in to see the plans as drawnPerformance outcomes Acceptable outcomes
PO4 AO4.1
For reconfiguring a lot, development does not compromise the Development provides an effective evacuation route that
safety of people resulting from the flood risk associated with remains passable, with sufficient flood warning time, to enable
events exceeding the DFE. people to progressively evacuate to safe areas above the PMF
in the face of advancing flood or waters for events that exceed
the DFE.
OR
AO4.2
Development provides for an area of sufficient size and
dimensions on site above the PMF that allows for safe
congregation and refuge.
AO4.3
Where the existing roads servicing a development provide a
specific flood immunity (as determined by the Qld Transport
Road and Drainage Design Manual, Queensland Urban
Drainage Manual and the Australian Rainfall and Runoff
Guide), all lots have access to the flood free area identified in
Table 8.2.6.5 that matches the road immunity.
PO5 AO5
For reconfiguring a lot or operational works, development does In the Flood Hazard Overlay, or in areas otherwise determined
not directly, indirectly or cumulatively alter the flood to be subject to the DFE or DSTE, development ensures:
characteristics external to the development site for all flooding ﴾a﴿ there is no loss of onsite flood storage capacity;
and inundation events up to and including the DFE or DSTE
﴾b﴿ all changes to level, depth, duration and velocity of
based on:
floodwaters are contained within the site for all flood
﴾a﴿ current climate conditions; and events up to and including the DFE based on current
﴾b﴿ incorporating an appropriate allowance for the predicted climate and predicted impacts of climate change at
impacts of climate change. 2100; and
﴾c﴿ there is no acceleration or retardation of flows, or any
retardation in flood warning times, elsewhere on the
floodplain and to any overland flow paths; and
﴾d﴿ there is no increased stormwater ponding on sites
upstream, downstream or in the general vicinity of the
site.
Resilient building design and form
**FINAL DRAFT Post Consultation 2019**
Page 22 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.