Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                                Acceptable outcomes

PO4                                                                 AO4.1
For reconfiguring a lot, development does not compromise the        Development provides an effective evacuation route that
safety of people resulting from the flood risk associated with      remains passable, with sufficient flood warning time, to enable
events exceeding the DFE.                                           people to progressively evacuate to safe areas above the PMF
                                                                    in the face of advancing flood or waters for events that exceed
                                                                    the DFE.

                                                                    OR

                                                                    AO4.2
                                                                    Development provides for an area of sufficient size and
                                                                    dimensions on site above the PMF that allows for safe
                                                                    congregation and refuge.

                                                                    AO4.3
                                                                    Where the existing roads servicing a development provide a
                                                                    specific flood immunity (as determined by the Qld Transport
                                                                    Road and Drainage Design Manual, Queensland Urban
                                                                    Drainage Manual and the Australian Rainfall and Runoff
                                                                    Guide), all lots have access to the flood free area identified in
                                                                    Table 8.2.6.5 that matches the road immunity.
PO5                                                                 AO5
For reconfiguring a lot or operational works, development does      In the Flood Hazard Overlay, or in areas otherwise determined
not directly, indirectly or cumulatively alter the flood            to be subject to the DFE or DSTE, development ensures:
characteristics external to the development site for all flooding   ﴾a﴿   there is no loss of on­site flood storage capacity;
and inundation events up to and including the DFE or DSTE
                                                                    ﴾b﴿   all changes to level, depth, duration and velocity of
based on:
                                                                          floodwaters are contained within the site for all flood
﴾a﴿   current climate conditions; and                                     events up to and including the DFE based on current
﴾b﴿   incorporating an appropriate allowance for the predicted            climate and predicted impacts of climate change at
      impacts of climate change.                                          2100; and
                                                                    ﴾c﴿   there is no acceleration or retardation of flows, or any
                                                                          retardation in flood warning times, elsewhere on the
                                                                          floodplain and to any overland flow paths; and
                                                                    ﴾d﴿   there is no increased stormwater ponding on sites
                                                                          upstream, downstream or in the general vicinity of the
                                                                          site.

Resilient building design and form




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 22 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.