2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable outcomes
PO11 AO11.1
Development ensures that public safety and the environment Materials manufactured or stored on site are not hazardous or
are not adversely affected by avoiding the release of hazardous noxious, or do not comprise materials that may cause a
materials into flood waters and the environment. detrimental effect on the environment if discharged in a flood
event.
OR
AO11.2
If a DFE is adopted, structures used for the manufacture or
storage of hazardous material are located above the DFE level.
OR
AO11.3
If a flood level is not adopted, hazardous materials and their
manufacturing equipment are located on the highest part of the
site to enhance flood immunity and designed to prevent the
intrusion of flood waters.
Editor’s Note— Refer to the Work Health and Safety Act
2011 and associated Regulation and Guidelines, the
Environmental Protection Act 1994 and the relevant building
assessment provisions under the Building Act 1975 for
requirements relating to the manufacture and storage of
hazardous substances. Information is provided by Business
Queensland on the requirements for storing and transporting
hazardous chemical.
Table 8.2.6.4 Flood Levels and Flood Immunity Requirements
Type of development Flood Level (Defined Flood Minimum design level – surface Minimum finished floor level
Event ) for a 2100 planning level
period
General
Business Activities 1% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
level level + 0.6m
Industrial Activities 1% AEP DFE/DSTE + 0.3m or DFE + 0.3m or Historical flood
Historical flood level + 0.6m level + 0.6m
Accommodation Activities 1% AEP DFE/DSTE + 0.3m or DFE + 0.3m or Historical flood
(excluding residential care Historical flood level + 0.6m level + 0.6m
facility)
Residential care facility 0.2% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
level level + 1m
Community Activities 0.2% AEP DFE/DSTE or Historical flood DFE+ 0.3m or Historical flood
(education establishment, level level + 1m
childcare centre)
**FINAL DRAFT Post Consultation 2019**
Page 26 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.