Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                              Acceptable outcomes

PO11                                                            AO11.1
Development ensures that public safety and the environment      Materials manufactured or stored on site are not hazardous or
are not adversely affected by avoiding the release of hazardous noxious, or do not comprise materials that may cause a
materials into flood waters and the environment.                detrimental effect on the environment if discharged in a flood
                                                                event.

                                                                  OR

                                                                  AO11.2
                                                                  If a DFE is adopted, structures used for the manufacture or
                                                                  storage of hazardous material are located above the DFE level.

                                                                  OR

                                                                  AO11.3
                                                                  If a flood level is not adopted, hazardous materials and their
                                                                  manufacturing equipment are located on the highest part of the
                                                                  site to enhance flood immunity and designed to prevent the
                                                                  intrusion of flood waters.

                                                                  Editor’s Note— Refer to the Work Health and Safety Act
                                                                  2011 and associated Regulation and Guidelines, the
                                                                  Environmental Protection Act 1994 and the relevant building
                                                                  assessment provisions under the Building Act 1975 for
                                                                  requirements relating to the manufacture and storage of
                                                                  hazardous substances. Information is provided by Business
                                                                  Queensland on the requirements for storing and transporting
                                                                  hazardous chemical.

Table 8.2.6.4 ­ Flood Levels and Flood Immunity Requirements
Type of development                 Flood Level (Defined Flood    Minimum design level – surface Minimum finished floor level ­
                                    Event ) for a 2100 planning   level
                                    period

General
Business Activities                  1% AEP                       DFE/DSTE or Historical flood       DFE + 0.3m or Historical flood
                                                                  level                             level + 0.6m
Industrial Activities                1% AEP                       DFE/DSTE + 0.3m or                 DFE + 0.3m or Historical flood
                                                                  Historical flood level + 0.6m     level + 0.6m
Accommodation Activities             1% AEP                       DFE/DSTE + 0.3m or                 DFE + 0.3m or Historical flood
(excluding residential care                                       Historical flood level + 0.6m     level + 0.6m
facility)
Residential care facility            0.2% AEP                     DFE/DSTE or Historical flood       DFE + 0.3m or Historical flood
                                                                  level                             level + 1m
Community Activities                 0.2% AEP                     DFE/DSTE or Historical flood       DFE+ 0.3m or Historical flood
(education establishment,                                         level                             level + 1m
childcare centre)




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                       Page 26 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.