Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                              Acceptable outcomes

PO9                                                               AO9.1
Essential community infrastructure is able to function            Essential community infrastructure is sited and constructed to
effectively during and immediately after flood events.            ensure that flood levels comply with flood immunity
                                                                  requirements specified in Table 8.2.6.4.

                                                                  AO9.2
                                                                  Essential community infrastructure which is located below the
                                                                  specified flood immunity requirements:
                                                                  ﴾a﴿   is designed and constructed to function effectively
                                                                        during and immediately after the recommended flood
                                                                        level event; and
                                                                  ﴾b﴿   has direct access to low hazard evacuation routes or an
                                                                        emergency rescue area above the PMF if it is for
                                                                        emergency services (including emergency shelters,
                                                                        police facilities, hospitals and associated facilities).

Earthworks
PO10                                                              AO10
Excavation and filling for operational works only occur where     Filling, other than accessways, does not extend more than 3
they:                                                             metres beyond the footprint of a building, measured from the
﴾a﴿   result in the protection, rehabilitation and repair of      outer walls of the building.
      ecologically important areas, watercourses, drainage
      lines and wetlands;
﴾b﴿   do not adversely impact on the overall hydrology,
      hydraulics and flood capacity of a waterway;
﴾c﴿   do not directly, indirectly or cumulatively cause adverse
      impacts external to the site;
﴾d﴿   do not cause increased flooding, which adversely affects
      the safety or use of any land upstream or downstream;
﴾e﴿   do not cause ponding of water on the site or nearby
      land;
﴾f﴿   do not result in a reduction in flood storage capacity;
﴾g﴿   do not adversely affect the flow of water in any overland
      flow path; and
﴾h﴿   do not adversely affect the privacy or visual amenity of
      surrounding property.

Editor’s Note— The Earthworks Code sets out further
requirements for earthworks.
Hazardous materials




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                     Page 25 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.