Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Table SC3.1.3—Planned density and demand generation rate for a trunk infrastructure network

                      Major centre zone –      60%
                      Noosa Business
                      Centre
                      Business Park &
                      Business precinct
                                                                                     Retail = 60
                      Major centre zone -      45%
                                                                                  Commercial = 24
                      Noosa Business
                                                                                 Community purpose   n/a    0.85 – 0.9
                      centre
                                                                                        = 30
                      Innovation precinct
                                                                                    Industry = 5
                      Major Centre zone-     30%
                      Noosa Business         (GFA limited by
                      Centre Retail precinct Table 6.4.1.3, PO74
                                             of The Noosa
                                             Plan.)
                      Major Centre zone –      60 %
                      Noosa Business           (GFA limited by
                      Centre Showroom          Table 6.4.1.3, PO70
                      precinct                 of The Noosa
                                               Plan.)
                      Major centre zone –      56%                 26
                      Noosa Business           (GFA limited by
                      Centre Village Mixed     Table 6.4.1.3, PO76
                      use Precinct             of The Noosa
                                               Plan.)
                      Major Centre - Noosa     55%
                      Fair
                      Major Centre - Noosa     66%                   137
                      Junction
                      District Centre Zone     48%                   35
                      District centre Zone     33%                   24
                      >2000m²
                      District centre zone                           144
                      lots 3 & 4 RP122928                                            Retail = 60
                      District Centre zone –   50%                   17           Commercial = 24
                      Mary Thomas St                                             Community purpose   n/a    0.85 – 0.9
                      Precinct                                                          = 30
                                                                                    Industry = 5
                      Local Centre zone        70%                   33
                      Local Centre zone        38%                   18
                      >2000m²
                      Local Centre zone –      70%                   46
                      Peregian Beach
                      Neighbourhood            56%                   26
                      Centre zone
                      Neighbourhood            38%                   18
                      Centre zone
                      >2000m2
                      Community facilities     50%                   0
                      zone




 **FINAL DRAFT - Post Consultation 2019**
                                                                                                           Page 5 of 97
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.