Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
Plans and drawings: the text below has words only, no drawings.
Very large file (23.3 MB): may take a few minutes to open.
Table SC3.1.3—Planned density and demand generation rate for a trunk infrastructure network
Community Facilities 33% 27
zone – Residential
care facility
Innovation zone 45% 0
Low Impact industry 60% 0
zone
Medium impact 60% 0
industry zone
Cooroy Residential development (vpd / dwelling)
Detached residential
Low Density 0% 16 0.75
residential zone 6.5 5.5
Low Density
residential zone 0% 25
800-1200m²
Attached residential
Medium Density 0% 33 4 0.76-0.82
residential zone
Non-Residential development (vpd / 100m² GFA)
District centre zone 48% 35
District centre zone 33% 24
Retail = 60 n/a 0.85-0.9
Community facilities 50% 0 Commercial = 24
zone Community purpose
Community facilities 33% 27 = 30
zone - Residential Industry = 5
care facility
Low impact industry 60% 0
zone
Medium impact 60% 0
industry zone
Boreen Point Residential development (vpd/dwelling)
Detached residential
6.5 5.5 0.65
Low Density 0% 5
residential zone –
Hinterland Village
Non-Residential development (vpd/100m² gfa)
Local centre zone 70% 33 Retail = 60
Commercial = 24 n/a 0.85 – 0.9
Local centre zone 38% 18
Community purpose
>2000m²
= 30
Community facilities 50% 0 Industry = 5
zone
Cooran Residential development (vpd/dwelling)
**FINAL DRAFT - Post Consultation 2019**
Page 6 of 97
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.