2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
             Column 1                                                                                                             Column 3
   Service catchment3                                                                              Existing and projected demand (persons)

Outside PIA (Balance                         14,652                       14,874                15,180                 15,348        18,954
Rural Hinterland)



3Note— Table SC3.1.8 Column 1 the service catchments for the public parks and land for community facilities network are identified
on Local Government Infrastructure Plan Maps LGIP-PIA-SC1 to LGIP-PIA-SC11 in Schedule 3 (local government infrastructure
mapping and tables).

SC3.2          Schedule of works
Table SC3.2.1          Stormwater network schedule of works

Column 1                             Column 2                                Column 3                       Column 4
Map reference                        Trunk infrastructure                    Estimated timing               Establishment cost4

Stormwater Maps LGIP-SW1-LGIP-SW-14
SW01                                 Pomona , Rifle Street                   2016 / 2017                    $2,687,500
                                     Pomona Rifle Street Flood
                                     Mitigation
SW02                                 Tewantin, Cooroy Noosa Road
                                     Noosa Cooroy Road (opposite             2016 / 2017                    $213,364
                                     Tewantin Golf Course) Upgrade
                                     of Culverts and auxiliary
                                     drainage
SW03                                 Tewantin, Daintree Estate – Golf        2016 / 2017                    $1,343,750
                                     Course Drive
                                     Upgrade of Stormwater
                                     Infrastructure
SW04                                 Noosa Heads, Pinaroo Park,
                                     Reconstruction of Stormwater            2021 -2026                     $423,201
                                     outlet including GPT / Bio
                                     retention Basin and Dispersion
                                     Bund Upgrades
SW05                                 Noosa Heads, Cooyar Street
                                     Street (East of Noosa Springs           2021 -2026                     $252,484
                                     Drive)
                                     Bio retention Basin / Infiltration
                                     Basin & Dispersion Bund
SW06                                 Noosa Heads, Cooyar Street
                                     (Opposite Wyandra)                      2021 -2026                     $383,261
                                     Upgrade existing Bio retention
                                     System and Gross Pollutant
                                     Trap
SW07                                 Noosa Heads, Cooyar Street
                                     (Elanora Terrace to Safari Street)
                                     Bio retention Basin / Infiltration 2021 -2026                          $162,956
                                     Basin & Dispersion Bund
SW08                                 Sunrise Beach, Ben Lexcen
                                     Drive and Grasstree Court               2021 -2026                     $421,880
                                     Bio retention Basin / Infiltration
                                     Basin & Dispersion Bund




  **FINAL DRAFT - Post Consultation 2019**
                                                                                                                                Page 12 of 97
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.