Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Column 1                           Column 2                            Column 3           Column 4
Map reference                      Trunk infrastructure                Estimated timing   Establishment cost5
R11                                Sunshine Beach, Ben Lexcen Dr       2021-2026          $2,128,215
                                   / Eenie Creek Rd
                                   Upgrade signalised intersection
R12                                Noosaville, Eumundi Noosa Rd /      2021-2026          $338,952
                                   Eenie Creek Rd
                                   Upgrade roundabout capacity
R13                                Noosaville, Reef St / Mary St       2021-2026          $425,823
                                   Upgrade roundabout capacity
R14                                Cootharaba, Wapunga Lane            2026-2031          $1,037,592
                                   (Bridge)
                                   Upgrade one lane bridge to two
                                   lane bridge re Safety Issues
R15                                Noosaville, Gympie Tce –            2017-2018          $696,730
                                   Eumundi Rd/Gibson Rd
                                   roundabout to Cloudsley St. Incl.
                                   Hilton Tce/Gympie Tce
                                   roundabout.
R16                                Noosaville, Weyba Rd – Leslie       2017-2018          $1,490,790
                                   Dr. to Reef St
R17                                Noosa Heads, Noosa Parade –         2020-2022          $5,791,400
                                   full corridor upgrade to achieve
                                   improved bicycle safety and bus
                                   transit.
R18                                Tewantin, Cooroy Noosa Rd /         2016-2017          $95,138
                                   Beckmans Rd intersection
                                   Improvements to the existing ‘T’
                                   intersection for cycling safety
R19                                Tewantin, Cooroy Noosa Rd,          2016-2017          $2,442,448
                                   Upgrading to include bike lands
R20                                Castaways Beach, David Low          2018/2019          $236,500
                                   Way
                                   Safety Improvements at
                                   Castaways Carpark
R21                                Noosa Shire Wide, Directional       2019/2022          $575,000
                                   Signage
R22                                Noosaville, Sea Eagle Drive &       2019/2020          $187,184
                                   High School Safe ST
R23                                Tewantin, Beckmans Rd               2016-2021          $0
                                   Duplication of Beckmans Road                           De-maining Agreement
                                   (Tewantin by-pass Eumundi
                                   Noosa Rd - Cooroy Noosa Rd)
                                   including intersection upgrades
Pathways Maps LGIP-PB-1 to LGIP-PB-14
PW01                               Cooroibah, Lake Cooroibah      2021-2026               $715,358
                                   Road
                                   Connection from McKinnon Drive
                                   to Lake Cooroibah




 **FINAL DRAFT - Post Consultation 2019**
                                                                                                           Page 14 of 97
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.