Column 1                           Column 2                          Column 3           Column 4
Map reference                      Trunk infrastructure              Estimated timing   Establishment cost5
PW01.1                             Cooroibah, Lakeway Dr             2021-2026          $123,562
                                   Connection from Lake
                                   Cooroibah Rd to Lake
                                   Cooroibah
PW02                               Cooroy, Swift Drive               2026-2031          $305,370
                                   Lake Mac Dr to Gumtree Dr
PW02.1                             Cooroy, Swift Drive connection to 2018-2019          $23,381
                                   Town Centre
                                   Cooroy Noosa Rd Service Rd to
                                   Olivine St direction from lane
PW03                               Cooroy, Lake Macdonald Drive      2026-2031          $916,110
                                   Lake Macdonald Drive,
                                   connection to Botanic Gardens
                                   to Town Centre
PW04                               Sunshine Beach, Hill Street -     2017-2018          $123,406
                                   Pathway upgrade and
                                   pedestrian safety improvements
PW05                               Sunshine Beach, Heathland         2026-2031          $566,904
                                   Drive, David Low Way, Edward
                                   street
                                   Missing Link and Connections
                                   Pathway upgrade and
                                   pedestrian safety improvements
PW06                               Peregian Beach, David Low Way     2017-2018          $88,072
                                   Pedestrian safety improvements
                                   and Rufous Street, Community
                                   centre connection to Village
PW07                               Peregian Beach, David Low         2026-2031          $298,748
                                   Way shared pathway link to
                                   Shire boundary
PW08                               Cooran, Queen Street            2021-2026            $61,780
                                   Queen Street Extension to Royal
                                   Court
PW09                               Pomona, Reserve Street            2021-2026          $188,594
                                   End of existing path to Pioneer
                                   Rd.
PW10                               Pomona, Hill Street               2021-2026          $60,523
                                   Connection of missing Link
PW11                               Pomona, Clay Street               2021-2026          $47,458
                                   Connection of missing Link to
                                   Public School
PW12                               Noosa Heads, Park Road            2017-2018          $7,014,375
                                   Park Road, Boardwalk
                                   Construction
                                   Upgrade Boardwalk from Little
                                   Cove to National Park
PW13                               Noosa Heads, Noosa Parade         2021-2026          $556,077
                                   Noosa Parade Upgrade of
                                   Pathway from Munna Point
                                   Bridge to Noosa Drive



 **FINAL DRAFT - Post Consultation 2019**
                                                                                                         Page 15 of 97
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.