Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Column 1                           Column 2                            Column 3           Column 4
Map reference                      Trunk infrastructure                Estimated timing   Establishment cost5
PW29                               Peregian, Plover St.– Piper St to   2016-2021          $18,237
                                   David Low Way 60m
PW30                               Peregian, Podargus Parade–          2021 - 2026        $219,484
                                   Parakeet Cres. To Persimmon
                                   Drive – new path link 675m
PW31                               Castaways Beach, Driftwood          2016 - 2021        $21,276
                                   Drive – David Low Way to
                                   Wavecrest Dr. – new 2.0 m
                                   pathway on north side to link
                                   new bus stop 70m
PW32                               Sunrise Beach, Wollomia Way - 2021-2026                $252,001
                                   Orient Drive to Dame Pattie Drive
                                   – new 2.0m pathway 775
PW33                               Sunshine Beach, Pacific Avenue      2021-2026          $221,111
                                   – Edward St. to Hill St – new
                                   path east side 680m


PW34                               Sunshine Beach, Ferguson St.–       2021 - 2026        $61,780
                                   Pacific Av. to Duke St. upgrade
                                   and widen existing 190m
PW35                               Sunshine Beach, Duke St.–       2021 - 2026            $27,639
                                   Ferguson St. to Douglas St. 85m
PW36                               Boreen Point, Laguna St.–           2021 - 2026        $76,413
                                   Hector St. to Vista St. new
                                   path 235m
PW37                               Boreen Point, Vista St.– Laguna     2021-2026          $78,039
                                   St. to shops 240m
PW38                               Tewantin, Furness Drive –           2021-2026          $149,575
                                   Blackheath Dr to St Andrews Dr
                                   Completes missing link around
                                   Furness Dr – 460m
PW39                               Noosa Heads, The Parade -           2017-2018          $651,945
                                   Main Beach trunk pathway –
                                   upgrade and widening link from
                                   Surf Club to Park Road 90m
PW40                               Tewantin, Griffith Av – Cooroy      2021-2026          $270,135
                                   Noosa to No 64 – new
                                   pathway, 890m
PW41                               Noosaville, Goodchap St - Juron     2021-2022          $55,277
                                   to 88 on west side – missing
                                   link 170m
PW42                               Noosa Heads, Sunshine Beach         2019-2020          $93,525
                                   Road – Lighting - Transit Centre
                                   Underpass to Bicentennial
                                   Drive

Column 1                           Column 2                            Column 3           Column 4
Map reference                      Trunk infrastructure                Estimated timing   Establishment cost5

Bus Stops Maps LGIP-PB-1 to LGIP-PB-14
Hastus Number


 **FINAL DRAFT - Post Consultation 2019**
                                                                                                           Page 17 of 97
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.