Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Column 1                           Column 2                          Column 3           Column 4
Map reference                      Trunk infrastructure              Estimated timing   Establishment cost5
301503                             Tewantin Central, (Westbound)    2016-2017           $73,247
                                   Type C2 Shelter, Slab, Tactile
                                   Ground Surface Indicators, Kerb,
                                   Pathway connection, Pavement
                                   renewal, Embankment work
301579                             Castaways Beach (Northbound) 2017-2018               $50,616
                                   David Low Way / Wavecrest
                                   Drive
                                   Type C1-H Shelter, Slab, Tactile
                                   Ground Surface Indicators, Kerb,
                                   Pathway connection
301580                             Castaways Beach (Southbound)      2017-2018          $131,602
                                   David Low Way / Wavecrest
                                   Drive
                                   Retaining wall, Indent bay,
                                   Concrete slab, Type C4 Shelter,
                                   Tactile Ground Surface
                                   Indicators, Kerb, Relocation of
                                   service, Realign Guardrail and
                                   Pathway connections
301581                             Castaways Beach, Castaways
                                   Creek (Northbound)               2016-2017           $73,247
                                   Type C1-H Shelter, Slab, Tactile
                                   Ground Surface Indicators, Kerb,
                                   Pathway connection, Retaining
                                   wall and Concrete indent bay
301655                             Marcus Beach (Northbound)
                                   David Low Way / Mahogany Drive 2017-2018             $70,862
                                   Type C1-H shelter, pavement
                                   widening, Kerb, Tactile Ground
                                   Surface Indicators, slab and
                                   pathway connections
301656                             Marcus Beach (Southbound)
                                   David Low Way / Melaleuca         2017-2018          $60,739
                                   Street
                                   Type C1-H shelter, pavement
                                   widening, Kerb, Tactile Ground
                                   Surface Indicators, slab and
                                   pathway connections
301735                             Noosa Heads, Noosa Parade /       2019-2020          $16,217
                                   Ravenwood Drive
                                   Concrete Boarding point, Seat,
                                   Pathway, Kerb and Tactile
                                   Ground Surface Indicators
301736                             Noosa Heads, Noosa Parade /       2019-2020          $15,204
                                   Ravenwood Drive
                                   Concrete Boarding point, Seat,
                                   Pathway, Kerb and Tactile
                                   Ground Surface Indicators




 **FINAL DRAFT - Post Consultation 2019**
                                                                                                         Page 18 of 97
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.