Skip to the record
Accept no substitutions.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
      (o)   Driveway Easements and “battleaxe” reserves ­ widths
            (i)    (i) For long easements in rural areas a passing lane is required every 100 metres.

                                                                     Urban                                             Rural

Reserve width                                                     4.5 metres                                       10.0 metres
Driveway width                                                    3.0 metres                                        4.5 metres
Pavement                                                 Concrete Minimum 150mm                          Bitumen sealed gravel 200mm

(2)   Property Access
             (a)    A driver seated in a standard vehicle at the entrance to the road carriageway with the vehicle 30 millimetres in
                    distance back from the edge of the shoulder, must have clear visibility not less than the minimum sight distance for
                    the through road design speed.
             (b)    The gradient of the access must not exceed 15% within the road reserve.
             (c)    Pathways
                    (i)     Pathways shall be provided in accordance with the ‘desired level of service’ for each road classification and
                            along key pathway routes as required. The construction standard of concrete pathways shall comply in
                            alignment and slab thickness with the IPWEA standard drawings.
                    (ii)    Trunk pathways shall be coloured CCS Black or approved Noosa Council equivalent when not in a specific
                            streetscape palette.

             (d)    Signage and Line Marking
                    (i)     Signage and line marking shall generally comply with the Manual of Uniform Traffic Control Devices except
                            where overridden by the ‘Noosa Signage Guidelines’.
                    (ii)    The ‘Noosa Signage Guidelines’ control the design of signs generally below the level of Directional Signage.

             (e)    Public utilities
                    (i)     The standard service utility allocations are shown on Council’s relevant Standard Drawing. In some cases, in
                            difficult terrain, common trenching may be permitted.
                    (ii)    The developer shall bear the full cost of all new and altered service necessitated by the development and
                            arrange all necessary dealings and permits.

             (f)    Trees, Landscaping and Streetscape
                    (i)     The protection of trees and the enhancement of the environment is a key objective in Noosa so appropriate
                            landscaping is required for all developments.

             (g)    Street and Pathway Lighting
                    (i)     Street and Pathway Lighting shall be designed and installed in accordance with Australian Standards (ASNZS
                            1158.1­4).
                    (ii)    The standard of lighting for each classification of road is outlined in the ‘desired standard of service’.
                            Pathways lighting standards shall be determined on a case by case basis having regard to environmental
                            issues, river safety and public intrusion.
                    (iii)   Rate 2 lighting is preferred over Rate 3 lighting.
                    (iv)    Downward lighting is preferred to bollard lighting on pathways.
                    (v)     Council has a range of rate 3 lighting fittings in streetscape centres that must be matched by developers as
                            necessitated.

             (h)    Electricity Supply
                    (i)     It is the responsibility of the developer to obtain a certificate of Electricity Supply for the development.
                    (ii)    Underground supply of electricity is to be provided to each new allotment.

             (i)    Stormwater Drainage
                    (i)     Drainage design and construction shall comply with Queensland Urban Drainage Manual QUDM, excluding
                            the “Lawful Point of Discharge test” ­ whereby a written discharge approval will NOT be accepted.
                    (ii)    The minimum pipe size permitted in the road reserve is 375 millimetres, and the minimum box culvert is 300
                            millimetres.



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                      Page 6 of 9
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.