Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
            (iii)    fire fighting infrastructure, including water supply and storage, equipment and fittings, fire breaks and
                     maintenance/access trails;
            (iv)     potential areas of clearing of native vegetation based on the ecological assessment reports or environmental
                     management plan recently prepared for the site;
            (v)      details of landscape design requirements, including installation and maintenance requirements;
            (vi)     information for occupants, including required training for persons employed on the site during both construction and
                     operational phases;
            (vii)    details of long term management requirements, including the frequency, extent and intensity of burning in areas
                     proposed to be subject to regular controlled ignitions;
            (viii)   details of areas to be subject to mosaic or patch burning techniques and manual fuel reduction zones; and
            (ix)     any other measures based on or identified in a recently approved ecological assessment report or environmental
                     management plan for the site;

      (i)   address safe access/egress through hazard areas for evacuation and emergency services;
      (j)   identify the parties to be responsible for specific actions taken under the terms of the bushfire management plan; and
      (k)   provide justification for any variation from the bushfire hazard mitigation measures outlined in the Bushfire hazard overlay
            code.


SC6.9.5              Flood hazard assessment and mitigation report

(1)   This component of the planning scheme policy applies to development which required assessment against the Flood hazard
      overlay code and is intended to identify and provide guidance about information that may be required to support a development
      application.
(2)   Compliance with the Flood hazard overlay code may be demonstrated (in part) by the submission of a flood hazard assessment
      report and/or a flood hazard mitigation report prepared by a suitably qualified person in accordance with the following guidelines.
(3)   Flood hazard assessment report— A Flood hazard assessment report is to:
      (a)   consider Council’s adopted flood management and drainage studies for the relevant catchment(s); and
      (b)   as relevant, include accurate hydrological and hydraulic modelling of the waterway network and assessment of existing
            flooding and flood levels of major water systems, including modelling the 50%, 10%, 5% 1%, 0.5% and 0.2% AEP flood
            events and the PMF.

(4)   Flood hazard mitigation report— A flood hazard assessment report is to:
      (a)   assess the potential impacts of the development on flood hazard;
      (b)   assess the potential impacts of flood hazard on the development;
      (c)   recommend strategies to be incorporated into the proposed development to satisfy the outcomes of the Flood hazard
            overlay code;
      (d)   describe and evaluate the impact of the proposed mitigation strategies on the existing and likely future use of land and
            buildings in proximity to the proposed development; and
      (e)   address the following:
            (i)      water quality and impacts of erosion, sediment and pollutant loads on waterways;
            (ii)      the characteristics and drainage functions of waterways, including bank stability, natural flows and habitat values;
            (iii)    impacts on adjacent properties both upstream and downstream;
            (iv)     preferred areas and non­preferred areas on site for various activities based on the probability of inundation and the
                     volume and velocity of flows;
            (v)      the predicted impacts of climate change;
            (vi)     the use of flood resistant materials and construction techniques able to withstand relevant hydraulic and debris
                     loads where appropriate;
            (vii)    the location and height of means of ingress and egress, including possible floor free escape routes;
            (viii)   the location and height of buildings, particularly habitable floor areas;
            (ix)     structural design, including the design of footings and foundations to take account of static and dynamic loads
                     (including debris loads and any reduced bearing capacity owning to submerged soils);



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                  Page 3 of 4
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.