(x) the location and design of plant and equipment, including electrical fittings;
(xi) access requirements for maintenance of proposed infrastructure;
(xii) the storage of materials which are likely to cause environmental harm if released as a result if inundation or
stormwater flows;
(xiii) the appropriate treatment of water supply, sanitation systems and other relevant infrastructure;
(xiv) relevant management practices, including flood warning and evacuation measures;
(xv) details of any easements or reserves required for stormwater design; and
(xvi) details of detention/retention storages.
(5) The level of detail required for a particular development application should be determined in consultation with Council’s
development assessment officers.
SC6.9.6 Landslide
(1) Where a development is subject to the Landslide hazard overly code, a well made application will include a geotechnical, and
management plan including the impacts of mitigation techniques on flora and fauna.
(2) A site specific geotechnical analysis prepared by a registered professional engineer:
(a) identifying any potential stability and associated problems including—
(i) longterm stability of the site; and
(ii) any potential adverse effects by landslides originating on sloping land above the site;
(iii) longterm stability of the proposed development; and
(iv) access to the site in the event of a landslip; and
(b) detailing proposed methods of addressing any identified potential stability and associated problems.
**FINAL DRAFT Post Consultation 2019**
Page 4 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.