Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
                drawings.


SC6.10.4               Information to be provided for Construction or Demolition Works

(1)     The waste management plan for either the construction or demolition stage of a development is to contain the following
        Information:


Material On­Site                   Destination

                                    Re­use and Recycling                                                                               Disposal
Type of Material                    Estimated Volume (m³)             On­site specify proposed Off­site specify contractor Specify contractor and
                                                                      re­use or on­site recycling and recycling outlet     landfill site
                                                                      methods.
Excavation material
Garden organics
Bricks
Concrete
 Timber ­ please specify
 Plasterboard
 Metals ­ please specify
 Others ­ please specify
Note: Waste that cannot be collected by Council’s normal collection service is collected by an approved Regulated Waste Transporter.



(2)     An area is also to be allocated on the development site for the segregation of construction and demolition materials. Details of the
        site area to be used for on­site separation, treatment and storage (including weather protection) are to be provided on the plan
        drawings accompanying the application.


SC6.10.5               Waste management design criteria

(1)     Preliminary considerations prior to designing waste management facilities may include:
        (a)     types of waste generated from the site;
        (b)     presence or absence of service staff or on site management;
        (c)     distance waste needs to be moved to a waste storage area and/or collection area;
        (d)     mechanism or pathway used to move bins to the waste storage area;
        (e)     the need for a bin wash facility;
        (f)     whether the collection service will be kerbside or on private property; and
        (g)     whether a central waste storage area will be used prior to relocation of the bin to a bin collection point.

(2)     Council may consider the following matters in assessing applications under the Planning Act 2017:
        (a)     the types of waste generated;
        (b)     waste generation rates;
        (c)     minimum service levels;
        (d)     the types of waste storage bins;
        (e)     location of waste storage areas and bin wash areas;
        (f)     required size of waste storage areas
        (g)     safe vehicle and pedestrian access to bins; and
        (h)     nuisance issues.

(3)     Types of Waste Generated – Consideration of the following matters will determine the types of waste storage bins and the
        minimum service level required;


   **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                                  Page 2 of 10
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.