Skip to the record
Accept no imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                         Acceptable outcomes

PO2                                                          AO2.1
Essential community infrastructure is is able to function    Development involving essential community infrastructure is
effectively during and immediately after landslide events.   not located within a landslide hazard area as identified on
                                                             a Landslide Hazard Overlay Map;

                                                             OR

                                                             AO2.2
                                                             Development involving essential community infrastructure is
                                                             located in a low or very low landslide hazard area and on land
                                                             less than 15% slope, as determined by a site­specific slope­
                                                             analysis;

                                                             Editor's Note—A site­specific geotechnical assessment may
                                                             be used to demonstrate that although the proposed
                                                             development is shown on the Landslide Hazard Overlay as
                                                             being in the moderate, high or very high landslide hazard area,
                                                             the landslide risk is low or very low.

                                                             AO2.3
                                                             A site­specific geotechnical assessment is prepared by a
                                                             registered professional engineer to certify that:
                                                             ﴾a﴿   the long term stability of the site, including associated
                                                                   buildings and infrastructure, will be maintained and
                                                                   operational for the life of the development;
                                                             ﴾b﴿   access to the site will not be impeded by a landslide
                                                                   event;
                                                             ﴾c﴿   the community infrastructure will not be adversely
                                                                   affected by landslide activity originating from other land,
                                                                   including land above the site; and
                                                             ﴾d﴿   development of the site will not increase the risk of
                                                                   landslide activity on other land.


Sloping sites, landscape character and scenic amenity                  Table 8.2.8.3 ­ Criteria for assessable
development (part)
Performance outcomes                                         Acceptable outcomes

Sloping sites, landscape character and scenic amenity




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                   Page 42 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.