Skip to the record
Accept no imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
            (v)      Development provides for adequate separation from the gas pipeline and corridor.
            (vi)     Development avoids compromising the future operation of the gas pipeline within the gas pipeline corridor.
            (vii)    Development avoids the storage of hazardous materials in proximity to the gas pipeline corridor.
            (viii)   The number of people exposed to the potential adverse impacts of the future gas pipeline in the gas pipeline
                     corridor is minimised.


Table 8.2.9.3         Criteria for assessable development­ Water Resources
Performance outcomes                                                  Acceptable outcomes

Water catchment
PO1
Development does not cause adverse effects on:                       No acceptable outcomes provided
(a)   the quality and quantity of water entering Lake Macdonald,
      Cedar Pocket Dam or its tributaries, or the Mary River         Editor’s Notes—
      drinking water intake;                                         Requirements relating to water quality, stormwater
(b)   flow regimes, flooding levels or flood volumes outside the     management and effluent disposal are contained in the Water
      boundaries of the site; and                                    Quality and Drainage Code in Part 9.
(c)   the environmental values, land resources and natural
      systems in these catchments.                                   Requirements relating to excavation and filling are contained in
                                                                     the Earthworks Code in Part 9.

                                                                     Requirements relating to flooding and environment protection
                                                                     and waterways management are contained in the Flood Hazard
                                                                     Overlay Code and the Biodiversity, Waterways and Wetlands
                                                                     Overlay Code in Part 8.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 45 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.