Log in to see the plans as drawnPerformance outcomes Acceptable outcomes
PO4 AO4.1
Development on sloping sites provides safe and efficient Driveways are not steeper than 20% for more than 20 metres
access for vehicles and pedestrians or one quarter of their length, whichever is the lesser, and
not steeper than 25% in any location.
AO4.2
Vehicle turning areas are provided at the end of driveways so
that it is not necessary to reverse up or down driveways.
AO4.3
Where a driveway is steeper than 20% in any part, it is
provided with a slipresistant surface.
8.2.9 Regional Infrastructure Overlay Code
8.2.9.1 Application
(1) This code applies to assessable development:
(a) subject to the Regional Infrastructure overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
(b) identified as requiring assessment against the Regional Infrastructure overlay code by the tables of assessment in Part 5
(Tables of assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
8.2.9.2 Purpose and overall outcomes
(1) The purpose of the Regional Infrastructure overlay code is to:
(a) For water resources:
(i) protect Lake Macdonald Catchment located wholly within the Noosa Shire; and
(ii) protect the Mary River Catchment partially contained within Noosa Shire.
(b) For major electricity infrastructure:
(c) (i) ensure development is compatible with and does not adversely affect the operation of the gas pipeline; and
(ii) ensure development is compatible with and does not adversely affect the operation of major electricity infrastructure,
(2) The overall outcomes sought for the Regional Infrastructure overlay code are:
(a) For water resources:
(i) Development is located, designed and managed to maintain or improve water quality, flow regimes, environmental
values and natural systems in a water supply catchment.
(ii) Development ensures there is no cumulative impact on water quality.
(iii) Development adopts sustainable land use practices within the water catchment to avoid adverse impact on the
environment.
(iv) Development avoids any adverse effects on the water supply infrastructure.
(v) The Mary River drinking water intake is not adversely affected by development or the effects of development.
(b) For major energy infrastructure:
(c) (i) Development provides for adequate separation from the Major Electricity Transmission Line Corridor.
(ii) Development avoids compromising the operation of major electricity infrastructure, including the Major Electricity
Transmission Line.
(iii) The number of people exposed to the potential adverse impacts of major electricity infrastructure is minimised.
(iv) Development provides for adequate separation from the gas pipeline corridor.
**FINAL DRAFT Post Consultation 2019**
Page 44 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.