Skip to the record
Accept no imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
PO3                                                                  AO3.1
Development does not discharge wastewater unless                     Development does not generate wastewater.
demonstrated to not compromise the drinking water supply
environmental values.                                                OR

                                                                     AO3.2
                                                                     Wastewater generated from the development is collected and
                                                                     contained on site, and is:
                                                                     (a)   lawfully disposed to sewer;
                                                                     (b)   transferred off­site for treatment/disposal to an
                                                                           appropriately licensed facility;
                                                                     (c)   treated to meet the drinking water supply environmental
                                                                           values prior to release; or
                                                                     (d)   reused on­site in a closed­cycle irrigation scheme,
                                                                           industrial processes, washing/cleaning or other purpose.


                                                                     AO3.3
                                                                     Where treated wastewater is irrigated to land, it will:
                                                                     (a)   be confined to a dedicated area of land on­site;
                                                                     (b)   be suitably located and sized; and
                                                                     (c)   use irrigation practices that will not harm groundwater and
                                                                           on­site surface water quality.


                                                                     Editor's note­ Developments involving the irrigation of wastewater
                                                                     will need to provide a MEDLI Modelling Report demonstrating the
                                                                     nominated land area for wastewater irrigation is suitably located
                                                                     and sized to accommodate design wastewater loads, storages are
                                                                     suitably sized to accommodate design wastewater loads, and
                                                                     proposed irrigation practices will not damage water quality. It is
                                                                     recommended the modelling exercise incorporate scenarios
                                                                     based on both a 10­year and 20­year planning horizon and
                                                                     incorporate a minimum of three irrigation concepts.
PO4
Management, handling and storage of hazardous chemicals              No acceptable outcome provided
(including fuelling of vehicles) within a Water supply buffer, is
undertaken in secured, climate controlled, weather proof, level
and bunded enclosures.
PO5                                                                  AO5
Development maintains an adequate separation distance and            Development complies with the separation distances by stream
avoids areas of potential flood inundation to protect waterways or   order as specified in Table 8.2.9.3A
water supply sources.
Bulk Water Infrastructure
PO6                                                                  AO6
Development is set back from bulk water supply infrastructure to:    Development is setback in accordance with Table 8.2.9.3B
(a)   avoid safety risks to people and property;                     ‘Recommended separation distances from bulk water supply
                                                                     infrastructure’.
(b)   minimise noise and visual impacts to people and property;
      and
(c)   ensure the physical integrity and operation, maintenance
      and expansion of the infrastructure is not compromised.

PO7                                                                  AO7
Vegetation planted near pipelines does not pose any risk to the      Planting near pipelines complies with the current Seqwater
physical integrity and operation of the bulkwater pipelines.         Network Consent Guidelines.



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 47 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.