Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPO3 AO3.1
Development does not discharge wastewater unless Development does not generate wastewater.
demonstrated to not compromise the drinking water supply
environmental values. OR
AO3.2
Wastewater generated from the development is collected and
contained on site, and is:
(a) lawfully disposed to sewer;
(b) transferred offsite for treatment/disposal to an
appropriately licensed facility;
(c) treated to meet the drinking water supply environmental
values prior to release; or
(d) reused onsite in a closedcycle irrigation scheme,
industrial processes, washing/cleaning or other purpose.
AO3.3
Where treated wastewater is irrigated to land, it will:
(a) be confined to a dedicated area of land onsite;
(b) be suitably located and sized; and
(c) use irrigation practices that will not harm groundwater and
onsite surface water quality.
Editor's note Developments involving the irrigation of wastewater
will need to provide a MEDLI Modelling Report demonstrating the
nominated land area for wastewater irrigation is suitably located
and sized to accommodate design wastewater loads, storages are
suitably sized to accommodate design wastewater loads, and
proposed irrigation practices will not damage water quality. It is
recommended the modelling exercise incorporate scenarios
based on both a 10year and 20year planning horizon and
incorporate a minimum of three irrigation concepts.
PO4
Management, handling and storage of hazardous chemicals No acceptable outcome provided
(including fuelling of vehicles) within a Water supply buffer, is
undertaken in secured, climate controlled, weather proof, level
and bunded enclosures.
PO5 AO5
Development maintains an adequate separation distance and Development complies with the separation distances by stream
avoids areas of potential flood inundation to protect waterways or order as specified in Table 8.2.9.3A
water supply sources.
Bulk Water Infrastructure
PO6 AO6
Development is set back from bulk water supply infrastructure to: Development is setback in accordance with Table 8.2.9.3B
(a) avoid safety risks to people and property; ‘Recommended separation distances from bulk water supply
infrastructure’.
(b) minimise noise and visual impacts to people and property;
and
(c) ensure the physical integrity and operation, maintenance
and expansion of the infrastructure is not compromised.
PO7 AO7
Vegetation planted near pipelines does not pose any risk to the Planting near pipelines complies with the current Seqwater
physical integrity and operation of the bulkwater pipelines. Network Consent Guidelines.
**FINAL DRAFT Post Consultation 2019**
Page 47 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.