Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPO8 AO8
Development is located and designed to maintain required Development does not restrict access to Bulk water supply
access to Bulk water supply infrastructure. infrastructure of any type or size, having regard to:
(a) buildings or structures;
(b) gates and fences;
(c) storage of equipment or materials;
(d) landscaping or earthworks or stormwater or other
infrastructure.
Table 8.2.9.3A Separation distances to waterways and water supply sources
Development type and activities Stream Order 1 to 3 Stream Order 4 or greater
Intensive animal industry 50 metres 100 metres
Aquaculture Casebycase basis Casebycase basis
All other agricultural or forestry land uses 50 metres 100 metres
Extractive industry 50 metres 100 metres
All other industrial uses 100 metres 100 metres
Outdoor sport and recreation
50 metres 100 metres
Major sport, recreation and entertainment
Service station 50 metres 100 metres
All other developments 50 metres 100 metres
Table 8.2.9.3B Recommended separation distances from bulk water supply infrastructure
Bulk water supply infrastructure asset Type of development Recommended separation distance
type minimum
Pipelines and channels (1) Buildings/Structures/Earthworks 20 metres from edge of pipe
Blasting(2,3) 200 metres from edge of pipe
Water treatment plants and water quality Sensitive Land Use 250 metres from building footprint
facilities
Buildings/Structures/Earthworks 20 metres from building footprint
Blasting (2,3) 200 metres from building footprint
Reservoir facilities Buildings/Structures/Earthworks 20 metres from building footprint
Blasting (2,3) 200 metres from building footprint
Pump stations Sensitive Land Use 100 metres from building footprint
Buildings/Structures/Earthworks 20 metres from building footprint
Blasting (2,3) 200 metres from building footprint
Dam structures and weirs (4) Earthworks Dam/Weir Height(5) 05 meters 50 metres from the toe of the dam/weir
Earthworks Dam/Weir Height(5) 510 metres 100 metres from the toe of the dam/weir
Earthworks Dam/Weir Height(5) 1015 150 metres from the toe of the dam/weir
metres
Earthworks Dam/Weir Height(5) 1520 200 metres from the toe of the dam/weir
metres
Earthworks Dam/Weir Height(5) > 20 metres 500 metres from the toe of the dam/weir
Blasting (2,3) 500 metres from dam wall/earth
embankment/weir footprint
**FINAL DRAFT Post Consultation 2019**
Page 48 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.