Log in to see the plans as drawnPerformance outcomes Acceptable Outcomes
Flood Hazard Area
PO16 AO16.1
Development is designed and sited to ensure risk to people and Where the development is located in the Flood Hazard Area as
property from flooding is avoided or minimised. shown on Flood Hazard Overlay Map in Schedule 2,
the finished floor level of habitable rooms is at least 300
millimetres above the Defined flood event (DFE);
OR
AO16.2
Where the DFE has not been modelled for the area, the finished
floor level of habitable rooms is at least 500 millimetres
above the highest recorded flood.
Editor's Note—The QDC mandatory provisions MP3.5 also apply
to the construction of buildings in flood hazard areas.
PO17
Underground car parking areas are designed to drain and No acceptable outcome provided
function safely during a flood event and power failure.
Editor's note—Basements should have flood immunity above the
1%AEP defined flood event with alternative means to mechanical
pumping used to achieve such immunity.
Major Electricity Infrastructure & Substations
PO18 AO18.1
Development is sufficiently separated from major electricity Development including any sensitive land uses is at least:
infrastructure and substations to minimise the likelihood of 50 metres from a transmission substation;
(a)
nuisance or complaint.
(b) 10 metres from any other substation; and
(c) 30 metres from a transmission line easement.
AO18.2
Habitable buildings are not located within an easement for a
distribution line.
PO19 AO19
Development is located and designed to avoid or minimise noise Noise emissions do not exceed 5db(A) above background noise
nuisance from the use of infrastructure. level internal to a habitable building measured in accordance with
AS1055.
PO20 AO20
Wherever practicable habitable buildings are orientated to avoid Where adjoining substations or major electricity infrastructure,
direct overlooking of major electricity infrastructure or substations. habitable buildings are orientated so that the majority of outdoor
living areas and windows of habitable rooms face away from
the infrastructure.
**FINAL DRAFT Post Consultation 2019**
Page 7 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.