Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable Outcomes
Earthworks and Drainage
PO21 No acceptable outcome provided
Earthworks and drainage operational works do not directly,
indirectly or cumulatively cause adverse Editor's Note—Development should ensure that filling does not
impacts external to the development site by: impact on the amenity and usability of neighbouring properties
(a) causing ponding of water on the site or nearby land; (including loss of privacy caused by relative level changes) or
offsite drainage.
(b) increasing flooding, which adversely affects the safety or
use of any land upstream and downstream;
(c) adversely affecting the flow of water in any
overland flow path; and
(d) adversely affecting the privacy or visual amenity
of surrounding property.
Landslide Hazard Area
PO22 AO22.1
Development maintains the safety of people, property and Development, including associated access, is not located on land
hazardous materials stored in bulk from the risk of landslide. identified as a landslide hazard area on a Landslide Hazard
Overlay Map.
AO22.2
Development, including associated access, is located outside
moderate, high and very high landslide hazard areas and areas
with 15% slope or greater, as determined by a sitespecific slope
analysis;
Editor's Note—A site specific geotechnical assessment may be
used to demonstrate that although the proposed development is
shown on the Landslide Hazard Overlay as being in the moderate,
high or very high landslide hazard area, the landslide risk is low or
very low.
OR
AO22.3
A sitespecific geotechnical assessment is prepared by a
registered professional engineer to certify that:
(a) the stability of the site, including associated buildings and
infrastructure, will be maintained and operational for the life
of the development;
(b) the site is not subject to the risk of landslide activity
originating from other land, including land above the site;
and
(c) development of the site will not increase the risk of
landslide activity on other land;
Editor's Note— PSP8 Natural Hazards provides further guidance
on assessing landslide hazard.
AO22.4
Any specific measures identified in a site specific geotechnical
assessment for stabilising the site or development are to be fully
implemented.
**FINAL DRAFT Post Consultation 2019**
Page 8 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.