Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable outcomes
Connectivity
PO5 AO5
Development is designed and operated to maintain and enhance Development is designed and operated to maintain ecological
connectivity between and across ecologically important areas and linkages and maximise opportunity for connectivity and the
connecting habitat and support unimpeded and safe movement of movement of fauna by:
terrestrial and aquatic fauna. (a) ensuring protection of wildlife refuges;
(b) maintaining vegetation in patches of the greatest possible
size and within the smallest possible edgetoarea ratio;
(c) enhancing connectivity through planting and rehabilitation
works, including across property boundaries, to areas of
national park, state forest or reserve;
(d) avoiding the creation of physical barriers and safety
hazards (such as roads, pedestrian access and instream
structures) along and within the ecological linkage;
(e) providing mitigation measures such as wildlife movement
infrastructure, fauna exclusion and directional fencing,
underpasses/overpasses and traffic calming devices,
signage and lighting; and
(f) where offsets are necessary, delivering offsets that support
and enhance ecological linkages.
Waterways and wetlands Table 8.2.2.3 Criteria for assessable development (part)
Performance outcomes
Waterways and wetlands
**FINAL DRAFT Post Consultation 2019**
Page 7 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.