Log in to see the plans as drawnPO6 AO6.1
The biodiversity and ecosystem values of waterways, wetlands Development and clearing of vegetation does not occur within:
and adjacent riparian zones are protected by: (a) a riparian buffer area;
(a) avoiding any new development in a riparian buffer area and (b) a wetland area; or
wetland area;
(c) 10 metres either side of the centre line of other waterways
(b) retaining aquatic and terrestrial habitat in riparian zones; identified on a Biodiversity, Waterways and Wetlands
(c) maintaining and enhancing wildlife corridors and Overlay Map.
connectivity along watercourses and drainage lines for
native fauna movement; AO6.2
(d) avoiding edge effects and damage from adjacent land Development provides for the rehabilitation of land within:
uses; (a) a riparian buffer area;
(e) maintaining stream integrity and bank stability by (b) a wetland area; and
minimising bank erosion and slumping;
(c) 10 metres either side of the centre line of any other
(f) maintaining water quality through filtering sediments, waterway identified on a Biodiversity, Waterways and
nutrients and other pollutants; and Wetlands Overlay Map.
(g) removing pest species and replacing them with local native
species. AO6.3
Recreational facilities (eg. playgrounds, pergolas, barbeques) are
setback a minimum of 10 metres from the top of the bank of a
waterway.
Editor’s Note—Setbacks to waterways for certain uses and works
are also specified in the relevant codes.
Editor's Note—Wetland areas are identified on the Queensland
Wetland Program mapping
Editor's Note—Any clearing of vegetation also needs to meet the
outcomes of the Earthworks Code and the Water Quality and
Drainage Code.
PO7
Vegetation within 400 metres of the full ponded water within Lake No acceptable outcome provided.
Macdonald is retained.
PO8 AO8.1
Development on land adjacent to a waterway or wetland Development adjacent to a waterway or wetland provides that:
maintains appropriate extent of public access to waterways and (a) no new lots directly back onto a riparian buffer area; and
wetlands and minimises edge effects.
(b) new public roads are located between a riparian buffer area
or riparian zone and the proposed development area.
Water hydrology Table 8.2.2.3. Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
Surface and ground water hydrology
**FINAL DRAFT Post Consultation 2019**
Page 8 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.