Development ensures that the natural surface water and ground Development does not impact on the natural surface water or
water hydrologic regimes of waterways, wetlands and groundwater hydrologic regimes and this is facilitated by:
hydrologicallysensitive plant communities are not adversely (a) avoiding or minimising channelization, redirection or
impacted. interruption of flow;
avoiding groundwater extraction;
Editor's Note—Groundwater dependent ecosystems are identified (b)
on Queensland Government Wetland Info mapping. (c) maintaining groundwater recharge and discharge
processes;
(d) maintaining natural groundwater fluctuations;
(e) avoiding causing ingress of saline water into freshwater
aquifers of wetlands; and
(f) avoiding contaminants entering groundwater (e.g. from
runoff, effluent disposal).
Rehabilitation of ecologically important areas Table 8.2.2.3 Criteria for assessable development
(part)
Performance outcomes Acceptable outcomes
Rehabilitation of ecologically important areas
PO10 AO10.1
Development provides for ecologically important areas to be Landscaping and rehabilitation complements and supports
restored and enhanced through: ecologically important areas by:
(a) designing landscaped areas to complement and enhance (a) utilising local native species;
existing vegetation and ecological linkages; (b) utilising suitable plant species identified in PSP2
(b) removing species likely to displace native flora species or Landscaping;
degrade fauna habitat; (c) restoring degraded ecosystems to achieve a functional
(c) replanting and rehabilitating degraded habitat; ecosystem state that requires minimal human intervention;
(d) replacing any vegetation removed with suitable local native (d) replicating adjacent remnant habitats of the same type,
species; including the understorey vegetation;
(e) providing for fauna habitat; and (e) creating or enhancing linkages between existing habitats;
(f) avoiding the planting of pest plant species. (f) avoiding the use of pest plant species listed in PSP2
Landscaping;
(g) planting riparian zones to filter stormwater runoff, stabilise
soil and provide for wildlife habitat; and
(h) providing ground and arboreal structures for fauna, which
may include ground depressions, rocks, hollows, nesting
boxes and instream habitat.
AO10.2
Vegetation cleared is replaced with:
(a) plantings of equivalent area that replicate the floristic
structure of the vegetation removed; or
(b) where this is not possible due to the characteristics of the
site and the development, plantings twice the number of the
removed trees and plants.
Editor’s Note — Revegetation and rehabilitation works are to be
carried out in accordance with an approved Revegetation and
Rehabilitation Management Plan, as referred to in PSP3
Ecological assessment guidelines.
**FINAL DRAFT Post Consultation 2019**
Page 9 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.